ebooksgratis.com

See also ebooksgratis.com: no banners, no cookies, totally FREE.

CLASSICISTRANIERI HOME PAGE - YOUTUBE CHANNEL
Privacy Policy Cookie Policy Terms and Conditions
London Heathrow Airport - Wikipedia, the free encyclopedia

London Heathrow Airport

From Wikipedia, the free encyclopedia

London Heathrow Airport


Heathrow Airport radar tower

IATA: LHR – ICAO: EGLL
Summary
Airport type Public
Owner/Operator BAA
Location London
Elevation AMSL 83 ft / 25 m
Coordinates 51°28′39″N 000°27′41″W / 51.4775, -0.46139
Website www.heathrowairport.com
Runways
Direction Length Surface
m ft
09L/27R 3,902 12,802 Grooved Asphalt
09R/27L 3,658 12,001 Grooved Asphalt
Statistics (2007)
Aircraft Movements 481,476
Passengers 68,066,028
Statistics from the UK CAA[1]

London Heathrow Airport or Heathrow (IATA: LHRICAO: EGLL), located in London, England, is the principal and biggest airport serving the United Kingdom. Heathrow is also Europe's busiest airport for passenger traffic, and handles more international passenger traffic than any other airport in the world.[2] Heathrow is owned and operated by BAA, which also owns/operates six other UK airports[3] and is itself owned by an international consortium led by the Spanish Ferrovial Group.[4] Heathrow is the primary hub of British Airways and Virgin Atlantic and a major hub for bmi.

Located 15 miles (24 km) west of Central London, England, Heathrow has two parallel main runways running east-west and five terminals. The site covers 12.14 square kilometres (4.69 square miles). Terminal 5 was officially opened by Queen Elizabeth II on 14 March 2008 and opened to passengers on 27 March 2008. Construction of Heathrow East to replace Terminal 2 and The Queens Building is planned to start in 2008 and be completed by 2012, and Terminals 3 and 4 will be refurbished during this period.[5] In November 2007 a consultation process began for the building of a new third runway.

Heathrow Airport has a CAA Public Use Aerodrome Licence (Number P527) that allows flights for the public transport of passengers or for flying instruction.[6]

Contents

[edit] Location

Heathrow (Greater London)
Heathrow
Heathrow
The location of Heathrow airport within Greater London
Qantas Boeing 747-400 descending near London Heathrow Airport
Qantas Boeing 747-400 descending near London Heathrow Airport

Heathrow is located 15 miles (24 km) west of Central London, England, near the southern end of the London Borough of Hillingdon and in the historic county of Middlesex. The airport stands on a parcel of land that was designated part of the London Metropolitan Green Belt. To the north, the airport is surrounded by the built-up areas of Harlington, Harmondsworth, Longford and Cranford. To the east are Hounslow and Hatton, and to the south are East Bedfont and Stanwell. To the west, the M25 motorway separates the airport from Colnbrook in Berkshire.

The location of the airport to the west of London, and the east-west orientation of its runways, means that airliners usually approach to land directly over the city. Other leading European airports such as those at Amsterdam, Frankfurt and Paris were located north or south of their cities to minimise the overflying problem.

Another disadvantage of the site is that it is low lying, at 83 feet (25 m) above sea level, and so is prone to fog.[citation needed]

Heathrow is one of six airports serving the London area, along with Gatwick, Stansted, Luton, Southend and City although only Heathrow and City airports are located within Greater London.

[edit] History

[edit] 1930s and 1940s

Aviation at the location of what is now Heathrow Airport began during World War I when the site was used as a military airfield. By the 1930s the airfield, then known as the Great Western Aerodrome, was privately owned by Fairey Aviation and was used for aircraft assembly and testing.[7] Commercial traffic used Croydon Airport which was London's main airport at the time.

In 1943 Heathrow came under the control of the Ministry of Air to be developed as a Royal Air Force transfer base.[7][8] Construction of runways began in 1944 on land that was originally acquired from the vicar of Harmondsworth. The new airport was built by Wimpey Construction[9] and named after the hamlet Heath Row which was demolished to make way for the airport, and was located approximately where Terminal 3 now stands.[10]

The Royal Air Force never made use of the airport, and following the end of World War II control was transferred to the Ministry of Civil Aviation on 1 January 1946. The first civil flight that day was to Buenos Aires, via Lisbon for refuelling. The airport opened fully for civilian use on 31 May 1946 and by 1947 Heathrow had three runways, with three more under construction. These older runways, built for the piston-engined planes of that era, were each slightly longer than a mile in length, arranged in a 6-point star pattern to allow for all wind conditions.

[edit] 1950s and 1960s

Heathrow in the 1960s
Heathrow in the 1960s

In 1953, the first slab of the first modern runway was ceremonially placed by Queen Elizabeth II. She also opened the first permanent terminal building, the Europa Building (now known as Terminal 2), in 1955. On 1 April 1955, a new 38.8 metre control tower designed by Frederick Gibberd was opened, replacing the original RAF control tower.

The Oceanic Terminal (renamed as Terminal 3 in 1968) opened on 13 November 1961 to handle flight departures for long-haul routes.[11] At this time the airport had a direct helicopter service from central London and gardens on the roof of the terminal building.[12] By the time Terminal 1 was opened in 1968, completing the cluster of buildings at the centre of the airport site, Heathrow was handling 14 million passengers annually.

The location of the original terminals in the centre of the site has since become a constraint to expansion. The decision to locate them here reflected an early assumption that airline passengers would not require extensive car parking, as air travel was then only affordable to the wealthy - who would be chauffeur-driven.[13]

In the late 1960s a 160 acres (0.6 km²) cargo terminal was built to the south of the southern runway, connected to Terminals 1, 2 and 3 by a tunnel.

[edit] 1970s to 1990s

The centralised waiting area at London Heathrow airport's terminal 3
The centralised waiting area at London Heathrow airport's terminal 3

In 1970 Terminal 3 was expanded with the addition of an arrivals building. Other facilities were also added, including the UK's first moving walkways.[14] Heathrow's two main runways, 9L-27R and 9R-27L, were also extended to their current lengths in order to accommodate new large jets such as the Boeing 747. The other runways were closed to facilitate terminal expansions, except for Runway 23 which was preserved for crosswind landings until 2002.

In 1977, the London Underground was extended to Heathrow; connecting the airport with Central London in just under an hour via the Piccadilly line. On 23 June 1998 the Heathrow Express train was inaugurated, providing a direct rail service to London's Paddington station via a specially constructed line between the airport and the Great Western Main Line.

Terminal 4 arrivals
Terminal 4 arrivals

Continued growth in passenger numbers to 30 million annually by the early 1980s led to the need for more terminal space. Terminal 4 was constructed to the south of the southern runway next to the existing cargo terminal, away from the three older terminals, and was connected with Terminals 1, 2 and 3 by the already-existing Heathrow Cargo Tunnel. Terminal 4 was opened by the Prince and Princess of Wales in April 1986, and became the home for then newly-privatised British Airways.

In 1987, the British government privatised the British Airports Authority (now known as "BAA Limited") which controls Heathrow[15] as well as six other UK airports.[16]

During the 1980s and 1990s, since privatisation BAA has expanded the proportion of terminal space allocated to retailing activities and invested in the development of retail activity. This has included expanding terminal areas to provide more shops and restaurants, and routing passengers through shops to maximise their exposure to the retail offer.

[edit] Accidents and incidents

  • On 3 March 1948 Sabena Douglas DC3 Dakota OO-AWH crashed in fog. Three crew and 19 of the 22 passengers died.[17]
  • On 31 October 1950 British European Airways Vickers Viking G-AHPN crashed at Heathrow after hitting the runway during a go-around. Three crew and 25 passengers died.[18]
  • On 1 August 1956 XA897 an Avro Vulcan strategic bomber of the Royal Air Force crashed at Heathrow after an approach in bad weather. The Vulcan was the first to be delivered to the RAF and was returning from a demonstration flight to Australia and New Zealand. The pilot and co-pilot ejected and survived but the four other occupants were killed.
  • On 27 October 1965 BEA Vickers Vanguard G-APEE flying from Edinburgh crashed on Runway 28R (now 27R) while attempting to land in poor visibility. All 30 passengers and six crew on board died.[19]
  • On 8 April 1968 BOAC Flight 712 Boeing 707 G-ARWE, departing to Australia via Singapore, had an engine fire just after take-off. The engine fell from the wing into a nearby gravel pit in Staines, before the plane managed to perform an emergency landing with the wing on fire. The plane burnt out on the ground. Five people, four passengers and a stewardess, died; 122 survived. Barbara Harrison, a flight attendant on board who helped with the evacuation, was posthumously awarded the George Cross.[20][21]
  • On 3 July 1968 G-AMAD an Airspeed Ambassador of BKS Air Transport dropped a wing during approach, causing the aircraft to contact the grass and swerve towards the terminal building. It hit two parked British European Airways Hawker Siddeley Trident aircraft, burst into flames and came to rest against the ground floor of the terminal building. Six of the eight crew died and eight horses onboard died. Trident G-ARPT was written off[22] and Trident G-ARPI was badly damaged, but repaired, only to be lost in the Staines crash in 1972.
  • On 18 June 1972 G-ARPI operating as BEA548 crashed in a field close to the Crooked Billet public house, Staines, two minutes after taking off. All 118 passengers and crew on board died.
  • On 5 November 1997 a Virgin Atlantic Airways Airbus A340-300 G-VSKY made an emergency landing with an undercarriage malfunction. Part of the undercarriage collapsed on landing and both aircraft and runway were damaged. Recommendations made as a result of the accident included one that aircraft cabin door simulators should more accurately reproduce operating characteristics in an emergency and for cockpit voice recorders to have a two hour duration in aircraft registered before April 1998.[23]
  • On 17 January 2008 a British Airways Boeing 777-236ER (G-YMMM) operating flight number BA038 from Beijing to London crash-landed at Heathrow. The aircraft landed on grass short of the south runway, 27L, slid to the edge of the runway, and stopped on the threshold. News pictures showed the undercarriage collapsed and the left wing visibly damaged. Eighteen minor injuries were confirmed with 13 people being admitted to hospital and Runway 27L was closed for a short time. The cause of the crash is yet to be determined and is being investigated by the AAIB, but a preliminary report issued by the AAIB at 12:42 GMT on 18 January 2008 stated that the engines had failed to respond to the flight crew's input 2 miles (3.2 km) from touchdown and at an altitude of 600 feet (180 m).[24][25]

[edit] Terrorism and security incidents

  • On 19 May 1974, the IRA planted a series of bombs in the Terminal 1 car park injuring two people.[26]
  • On 26 November 1983 the Brinks Mat robbery occurred, when 6,800 gold bars worth nearly £26 million were taken from the Brink's Mat vault near Heathrow. Only a fraction of the gold was ever recovered and only two men were convicted of the crime.[27]
  • On 17 April 1986 semtex explosives were found in the bag of a pregnant Irishwoman attempting to board an El Al flight. The explosives had been given to her by her Jordanian boyfriend and father of their unborn child Nizar Hindawi, and the incident became known as the Hindawi Affair.[28]
  • In 1994, over a six day period, Heathrow was targeted three times (8 March, 10 March and 13 March) by the IRA, who fired 12 mortars. Heathrow was a symbolic target due to its importance to the UK economy and the disruption caused when areas of the airport were closed over the period. Coverage of the incident was heightened by the fact that the Queen was being flown back to Heathrow by the RAF on 10 March.[29]
Concorde G-BOAB in storage at London Heathrow Airport following the end of all Concorde flying. This aircraft flew for 22,296 hours between first flight in 1976 and grounding in 2000. The control tower is in the background
Concorde G-BOAB in storage at London Heathrow Airport following the end of all Concorde flying. This aircraft flew for 22,296 hours between first flight in 1976 and grounding in 2000. The control tower is in the background
  • In March 2002, thieves stole US $3 million that had arrived on a South African Airways flight.[30]
  • In February 2003, the British Army was deployed to Heathrow, with 1,000 extra police officers, due to intelligence reports that al-Qaeda terrorists might launch surface-to-air missile attacks at British or American airliners.[31]
  • Scotland Yard's Flying Squad foiled an attempt by seven men to steal £40 million in gold bullion and a similar quantity of cash from the Swissport warehouse at Heathrow on 17 May 2004.
  • On 10 August 2006, the airport became the focus of changes in security protocol following the revelation of a supposedly al-Qaeda based 2006 transatlantic aircraft plot. New rules were put in force immediately with lengthy delays and inconvenience to passengers. These included the prohibition of carry-on luggage (except essential items such as travel documents and medication) and all liquids - although this was later relaxed to allow medications, as well as baby milk - provided both were tasted first by the passenger at the security checkpoint.[citation needed]
  • On 25 February 2008, Greenpeace activists protesting against the planned third runway managed to cross the tarmac and climb on top of a British Airways Airbus A320 which had just arrived from Manchester Airport. At about 09:45 GMT the protestors unveiled a banner over the aircraft's tailfin stating "Climate Emergency - No Third Runway" and by 11:00 GMT four arrests had been made.[32]
  • On March 13, 2008 a man with a rucksack scaled the perimeter fence onto runway 27R and ran across the grounds, resulting in his subsequent arrest. A controlled explosion of his bag took place, although nothing suspicious was found and the Metropolitan Police said that the incident was not terrorism related.[33]

[edit] Heathrow today

Heathrow Airport is used by over 90 airlines which fly to 170 destinations worldwide. The airport is the primary hub of British Airways and Virgin Atlantic and a major hub for bmi.

Of Heathrow's 67 million annual passengers, 11% travel to UK destinations, 43% are short-haul international travellers, and 46% are long-haul. The busiest single destination in terms of passenger numbers is New York, with over 3.4 million passengers travelling between Heathrow and JFK / Newark airports in 2006. [34] The airport has five passenger terminals (Terminals 1, 2, 3, 4 and 5) and a cargo terminal. Terminal 5 opened to passengers on 27 March 2008 and will be fully completed with the opening of its second satellite building in 2010.[35]

The Heathrow Academy
The Heathrow Academy

Originally, Heathrow had six runways, arranged in three pairs at different angles, with the passenger terminal in the centre. With growth in the required length for runways, Heathrow now has just two parallel runways running east-west. Runway 23, a short runway for use in strong south-westerly winds, was decommissioned in 2005 and now forms part of a taxiway. The Department for Transport has issued a 'consultation document' in which one option is the construction of a third parallel east-west runway for frequent use, involving the demolition of residential areas.

In 2006, the new £105 million Pier 6 was completed at Heathrow's Terminal 3 [36] in order to accommodate the Airbus A380 superjumbo, providing four new aircraft stands. Other modifications totalling in excess of £340 million [36] have also been carried out across the airfield in readiness for the Airbus A380, and the newly opened Terminal 5 is also fully compatible with the A380. The first A380 test flight into Heathrow took place on 18 May 2006,[37] but following delays to the aircraft's production, scheduled services did not commence from Heathrow until 18 March 2008, when Singapore Airlines flight SQ308 touched down from Singapore carrying 470 passengers, marking the first ever European commercial flight by the Airbus A380.[36]

A new 87 metres (285 ft) high £50 million air traffic control tower entered service on 21 April 2007, and was officially opened on 13 June 2007 by Secretary of State for Transport Douglas Alexander.

Heathrow Airport has Anglican, Catholic, Free Church, Muslim, Sikh, Hindu and Jewish Chaplains. There is a multi-faith prayer room and counselling room in each terminal, in addition to St. George's Interdenominational Chapel which is located in an underground bunker adjacent to the old Control Tower, where Christian services take place. The chaplains organise and lead prayers at certain times in the prayer room. There is an Anglican Service every Tuesday and Wednesday, daily Catholic Mass and Free Church prayers in the Chapel.

Heathrow's facilities were designed to accommodate either 45 or 55 million passengers annually according to BAA (55 million the figure presented to the T5 Inquiry, 45 million the figure used for the consultation into the third runway). With numbers now approaching 70 million and runway utilisation averaging 98%, it is difficult for existing airlines to obtain landing slots to enable them to increase their services from the airport, or for new airlines to start operations.[38] For the same reason the airport has become crowded and subject to delays, for which it has been criticised in recent years[39] and in 2007 the airport was voted the world's least favourite alongside Chicago O'Hare in a TripAdvisor survey.[40]

[edit] Operations

A Virgin Atlantic Airbus A340-300 seen near Heathrow
A Virgin Atlantic Airbus A340-300 seen near Heathrow

Aircraft destined for Heathrow usually enter its airspace via one of four main 'reporting points': Bovingdon (BNN) over Hertfordshire, Lambourne (LAM) over Essex, Biggin Hill (BIG) over Bromley and Ockham (OCK) over Surrey.[41] Each is defined by a VOR radio-navigational beacon. When the airport is busy, aircraft will orbit in the associated holds. These reporting points/holds lie respectively to the north-west, north-east, south-east and south-west of the London conurbation.

Air traffic controllers at Heathrow Approach Control (based in Swanwick, Hampshire) then guide the aircraft to their final approach, merging aircraft from the four holds into a single stream of traffic, sometimes as close as 2.5 nautical miles (4.6 km) apart. Considerable use is made of continuous descent approach techniques to minimise the environmental effects of incoming aircraft, particularly at night.[42] Once an aircraft is established on its final approach, control is handed over to Heathrow Tower.

Because aircraft generate significantly more noise on departure than when landing, there is a preference for "westerly operations" during daytime operations.[43] In this mode aircraft depart towards the west and approach from the east over London, thereby minimising the noise impact to the most densely populated areas. Heathrow's two runways generally operate in 'segregated mode' whereby arriving aircraft are allocated to one runway and departing aircraft to the other. To further reduce noise nuisance to people beneath the approach and departure routes, the use of runways 27R and 27L is swapped at 3 pm each day, when the wind is from the west. When easterly landings are in progress there is no alternation; 09L remains the landing runway and 09R the departure runway due to the Cranford protocol. Occasionally landings are allowed on the nominated departure runway, to help reduce airborne delays and to position landing aircraft closer to their terminal, thus reducing taxi times.

Night-time flights at Heathrow are subject to restrictions. Between 11.00 p.m. and 7.00 a.m. the noisiest aircraft (rated QC/8 and QC/16) cannot be scheduled to operate at all. In addition, between 11.30 p.m. and 6.00 a.m. (the night quota period) there are three limits:

  • A limit on the number of flights allowed;
  • A Quota Count system which limits the total amount of noise permitted, but allows operators to choose to operate fewer noisy aircraft or a greater number of quieter planes;[44]
  • A voluntary ban on QC/4 aircraft.

[edit] Security

Policing of the airport is the responsibility of the aviation security unit of the Metropolitan Police, however the army, including armoured vehicles of the Household Cavalry, has occasionally been deployed to the airport during periods of heightened security. Heathrow's reputation for thefts has led to it sometimes being referred to as 'Thiefrow'.[45]

[edit] Regulation

Further information: Landing slots
British Airways aircraft at Terminal 4
British Airways aircraft at Terminal 4

As BAA owns London's three major airports[46] and therefore has a monopolistic position, the amount it is allowed to charge airlines to land aeroplanes at Heathrow is heavily regulated by the Civil Aviation Authority (CAA). Until 1 April 2003, the annual increase in landing charge per passenger was capped at inflation minus 3%. From 2003 to 2007, charges increased by inflation plus 6.5% per year, taking the fee to £9.28 per passenger in 2007. In March 2008, the CAA announced that the charge would be allowed to increase by 23.5% to £12.80 from 1 April 2008, and by inflation plus 7.5% for each of the following four years.[47]

In addition, air traffic between Heathrow and the United States is strictly governed by the countries' bilateral Bermuda II treaty. The treaty originally allowed only British Airways, Pan Am, and TWA to fly from Heathrow to the US. In 1991 PAA and TWA sold their rights to United Airlines and American Airlines respectively, and Virgin Atlantic was added to the list of airlines allowed to operate on these routes. In 2002, American Airlines and British Airways announced plans to coordinate the scheduling of their trans-Atlantic routes but plans were dropped after the United States Department of Transportation made approval conditional on the granting of further access slots to Heathrow to other US airlines. American Airlines and British Airways considered the slots too valuable and dropped the plans.[48] The Bermuda bilateral agreement conflicts with the Right of Establishment of the United Kingdom in terms of its membership in the EU, and as a consequence the UK was ordered to drop the agreement in 2004. A new "open skies" agreement was signed by the United States and the European Union on 30 April 2007, and came into effect on 30 March 2008.

Whilst the cost of landing at Heathrow is determined by the CAA and BAA, the allocation of landing slots to airlines is carried out by Airport Co-ordination Limited (ACL).

[edit] Traffic and statistics

Queue of aircraft for take-off including jets from Virgin Atlantic, British Airways, Air India, and bmi
Queue of aircraft for take-off including jets from Virgin Atlantic, British Airways, Air India, and bmi

The operator of Heathrow, BAA, claims that Heathrow is the "world's busiest international airport",[49] but Heathrow is only the world's third-busiest airport by total passenger traffic, after Atlanta-Hartsfield-Jackson and Chicago O'Hare, which are also international airports. However, Heathrow has the highest number of international passengers.

In 2006 Heathrow was the busiest airport in Europe in terms of total passenger traffic (18.8% more passengers than at Paris Charles de Gaulle Airport and 27.9% more than at Frankfurt International Airport),[50] but it was third behind Charles de Gaulle and Frankfurt in terms of plane movements (11.9% fewer landings and take offs than at Charles de Gaulle, and 2.5% fewer than at Frankfurt).[51] Heathrow airport was fourth in terms of cargo traffic (36.9% less cargo than at Charles de Gaulle, 36.8% less than at Frankfurt, and 14.2% less than at Amsterdam Schiphol Airport).[52]

With only two runways operating at over 98% of their capacity, Heathrow has little room for growth. In order to increase traffic, BAA has proposed using the existing two runways in 'mixed mode' whereby aircraft would be allowed to take-off and land on the same runway.[53] This would increase the airport's capacity from its current 480,000 movements per year to as many as 550,000 according to British Airways CEO Willie Walsh.[54] BAA has also proposed to build a third runway to the north of the airport, which would significantly increase traffic capacity (see Future expansion below).[55]

In the short term the opening of Terminal 5 in 2008 will relieve pressure on terminal facilities, allowing modest growth from the use of larger aircraft such as the Airbus A380. However with passenger traffic at Charles de Gaulle growing by 5.8% to 59.3 million during the 12 months to September 2007, compared with Heathrow's fall of 0.4% to 67.6 million during the same period,[56] it is possible that CDG ---- with its four runways operating at only 73.5% capacity ---- could overtake Heathrow by 2010.[57]

American Airlines Boeing 777 landing at Heathrow
American Airlines Boeing 777 landing at Heathrow
Busiest International Routes out of London Heathrow Airport (2007)[58]
Rank Airport Passengers handled  % Change
1 John F. Kennedy International Airport 2,839,221 3.16
2 Dublin Airport 1,974,169 0.84
3 Amsterdam Airport Schiphol 1,799,214 2.54
4 Charles de Gaulle International Airport 1,789,538 9.19
5 O'Hare International Airport 1,604,770 5.51
6 Dubai International Airport 1,571,472 14.33
7 Hong Kong International Airport 1,453,229 2.57
8 Frankfurt Airport 1,449,577 4.20
9 Los Angeles International Airport 1,405,694 1.70
10 Madrid Barajas International Airport 1,180,326 5.33
11 Singapore Changi Airport 1,074,672 1.07
12 Munich Airport 1,067,237 3.84
13 Washington Dulles International Airport 1,054,834 1.40
14 San Francisco International Airport 1,032,103 0.41
15 Toronto Pearson International Airport 1,023,559 2.10

[edit] Terminals

[edit] Terminal 1

Terminal 1 was opened in 1968 and was formally opened by Queen Elizabeth II in May 1969. In 2005, a substantial redesign and redevelopment of Terminal 1 was completed, which saw the opening of the new Eastern Extension, doubling the departure lounge in size and creating additional seating and retail space. Terminal 1 handles most of Heathrow's domestic and Irish routes along with some long haul routes and European routes.

[edit] Terminal 2

Terminal 2 is Heathrow's oldest terminal and was opened as the Europa Building in 1955. Terminal 2, as well as the adjacent Queens Building, will close in 2008 after the opening of Terminal 5, to allow for the construction of the new Heathrow East terminal. According to BAA, Terminal 2 will be demolished in 2009. Terminal 2 handles mainly European routes.

[edit] Terminal 3

Terminal 3 was opened as The Oceanic Terminal on 13 November 1961 to handle flight departures for long-haul routes.[11] At this time the airport had a direct helicopter service to Central London from the gardens on the roof of the terminal building. The Oceanic Terminal was renamed as Terminal 3 in 1968 and was expanded in 1970 with the addition of an arrivals building. Other facilities were also added, including the UK's first moving walkways. In 2006, the new £105 million Pier 6 was completed[36] in order to accommodate the Airbus A380 superjumbo; Singapore Airlines now operate regular flights from Terminal 3 using the Airbus A380.

Redevelopment of Terminal 3's forecourt by the addition of a new four lane drop-off area and a large pedestrianised plaza, complete with canopy to the front of the terminal building was completed in 2007; these improvements were intended to improve passengers' experiences, reduce traffic congestion and improve security. BAA also have plans for a £1bn upgrade of the rest of the terminal over the next ten years.[59]

[edit] Terminal 4

Terminal 4 was constructed to the south of the southern runway next to the existing cargo terminal, away from the three older terminals, and was connected with Terminals 1, 2 and 3 by the already-existing Heathrow Cargo Tunnel. Terminal 4 was opened by the Prince and Princess of Wales in April 1986, and became the home for then newly-privatised British Airways.

Terminal 4 will also benefit from a major upgrade to its existing facilities once Terminal 5 has opened. BAA have stated that the building is in need of extensive refurbishment. As part of the redevelopment of Terminal 4, the amount of natural light entering the building will be assessed and the check-in facilities and airside departure lounge will also be upgraded.[59] Work is now underway on a complete refurbishment and modernisation of Terminal 4's forecourt to improve passengers' experiences, reduce traffic congestion and improve security.

Heathrow's Layout in 2006
Heathrow's Layout in 2006

[edit] Terminal 5

See also: Heathrow Terminal 5 building

The possibility of a fifth terminal at Heathrow emerged as early as 1982, when there was debate over whether the expansion of Stansted or the expansion of Heathrow (advocated by BA) was the way forward for the UK aviation industry.[60] Richard Rogers was selected to design the terminal in 1989 and BAA formally announced its proposal for T5 in May 1992, submitting a formal planning application on 17 February 1993.[61][62] A public inquiry into the proposals began on 16 May 1995 and lasted nearly four years, finally ending after sitting for 525 days on 17 March 1999.[63][64] Finally on 20 November 2001, more than eight years after the initial planning application, then-transport minister Stephen Byers announced the British government's decision to grant planning permission for the building of a fifth passenger terminal at Heathrow.

Terminal 5 under construction in July 2006
Terminal 5 under construction in July 2006

Built at a cost of £4.3 billion, the new terminal is located on the western side of the airport on the site of the former Perry Oaks sewage works, between the northern and southern runways. The four storeys of the main terminal building (Concourse A) are covered by a single-span undulating steel frame roof, stretching 90 metres (295 ft) from east to west. In addition to the main terminal building, there are also two satellite buildings linked to the main terminal by an underground people mover transit system. The first satellite (Concourse B) includes dedicated aircraft stands for the Airbus A380; Concourse C is currently under construction and scheduled to open in 2010.[35] In total, Terminal 5 has 60 aircraft stands and capacity for 30 million passengers annually; this will enable Heathrow to handle up to 90 million passengers a year, up from its previous figure of 68 million (compared with a design capacity of 45 million). There are more than 100 shops and restaurants.[65]

The transport network around the airport has been extended to cope with the increase in passenger numbers. A dedicated motorway spur has been built from the M25 between junctions 14 and 15 to the terminal, which includes a 3,800 space multi-storey car park. A more distant long-stay car park for business passengers will be linked to the terminal by a personal rapid transit system, which will open in 2009.[66] New branches of both the Heathrow Express and the Underground's Piccadilly Line serve a new shared Heathrow Terminal 5 station, which also has space for a third pair of tracks for future additional rail services. BAA are currently consulting on the route of a new rail link, called Heathrow Airtrack, to Staines High Street and through direct services to Reading, Guildford and London Waterloo. The terminal is also connected to Terminals 1, 2 and 3 by the Heathrow Airside Road Tunnel.[67]

Terminal 5 interior
Terminal 5 interior

Queen Elizabeth II officially opened Terminal 5 in a ceremony on 14 March 2008.[68] Used exclusively by British Airways, the terminal opened for passenger use on 27 March 2008,[69] with flight 26 from Hong Kong its first arrival. The first departure was Flight 302 to Paris at 06:20 GMT. However it quickly became apparent that the new terminal was not operating smoothly, and British Airways cancelled 34 flights and was later forced to suspend baggage check-in.[70] Over the following 10 days some 28,000 bags failed to travel with their owners,[71] and over 500 flights were cancelled. British Airways were not able to operate its full schedule from Terminal 5 until 8 April 2008.

A number of problems with the terminal's IT systems, coupled with insufficient testing and staff training, were the principal reasons for the difficulties[72] which caused BA to postpone the transfer of its long-haul flights from Terminal 4 to Terminal 5.[73] Consequently, BA will be occupying parts of Terminals 1 and 4 for longer than originally planned, with knock-on effects on other airlines scheduled to move into those areas.

[edit] Heathrow East Terminal

Plan of the future of Heathrow airport after the completion of Heathrow East
Plan of the future of Heathrow airport after the completion of Heathrow East

BAA announced in November 2005 that when Terminal 5 opens Terminal 2 will be closed to allow the Heathrow East scheme to be built.[74] This will see Terminal 2 and the Queen's Building offices being replaced by a new terminal capable of handling 30 million people; five million fewer than Terminals 1 and 2 are currently used by, although considerably more than the design capacity of the existing buildings. Work is planned to start in 2008 and to be completed by 2012, in time for the London Olympics, although reported delays are making this target unlikely.[75] Demolition of Terminal 2 is now scheduled for 2009. The plan envisages the complete realignment of piers more logically, the building of new ones on the now defunct cross-wind runway, and to provide for an increase in capacity, in a site taking up roughly the same amount of space as T5. The entire project is set to cost £1-1.5bn.[76] Planning permission was granted in May 2007 on condition that the project meets a number of 'green' targets.[77]

[edit] North Terminal

The current proposals for a third runway to the north of the current airport includes an additional terminal. Although currently referred to as "Terminal 6" by the time it could be built Terminals 1 and 2 would have been replaced by the East Terminal making it a possible fifth terminal overall.

[edit] Access

[edit] Public transport

Heathrow Express train at Paddington station
Heathrow Express train at Paddington station
Heathrow rail services
Heathrow
Express
Heathrow
Connect


CPICla CPIC CPICra
London Paddington
STRlf vABZlr STRrf
vSTR-BHF
Ealing Broadway Interchange to Central Line
vSTR-BHF
West Ealing (closed Sundays)
vSTR-BHF
Hanwell (closed Sundays)
vSTR-BHF
Southall
vSTR-BHF
Hayes & Harlington
vSTRe utSTR
Piccadilly Line
TUNNELa utABZlf utSTRlg
FLUG tCPICl CPIC utCPICr utSTR
Heathrow Central (rail) & Terminals 1, 2, 3 (tube)
tSTRrg tABZrl tSTRlg utSTR utSTRd
Free transfer between terminals on Heathrow Connect
FLUG tSTR tCPICle utCPICpassu utCPICr
Heathrow Terminal 4 rail & tube (Heathrow Connect Terminus)
tSTR utABZlf utSTRrf
Free transfer between terminals on Heathrow Express
FLUG tCPICl texCPICma CPIC utCPICre
Heathrow Terminal 5 (Heathrow Express Terminus)
texSTRlf texABZlg LUECKE
to London Waterloo
exTUNNELe exCPICla CPICr
Staines (proposed Heathrow Express Terminus)
HLUECKE eABZ3lf eHBHF eABZ3lg eABZ3rf ABZrf
Staines High Street (Proposed)
HLUECKE HSTR eABZ3rf HSTR STRrf
to Reading, Woking and Guildford
Heathrow
Airtrack
All Heathrow stations have step-free access

[edit] Car

Heathrow is accessible via the nearby M4 motorway and A4 road (Terminals 1–3), the M25 motorway (Terminals 4 and 5), and the A30 road (Terminal 4). There are drop off and pick up areas at all terminals and short and long stay multi-storey car parks. Additionally, there are car parks (not run by BAA) just outside the airport, these are connected to the terminals by shuttle buses. Heathrow airport is also served by taxi services.

Four parallel tunnels under one of the runways connect the M4 motorway and the A4 road to Terminals 1–3. The two larger tunnels are each two lanes wide and are used for motorised traffic. The two smaller tunnels were originally reserved for pedestrians and bicycles; to increase traffic capacity the cycle lanes have been modified to each take a single lane of cars, although bicycles still have priority over cars. Pedestrian access to the smaller tunnels has been discontinued, with the free bus services being the alternative.

[edit] Bicycle

There are (mainly off-road) bicycle routes almost to the terminals. Free bicycle parking places are available in car parks 1 and 1A, though use of the left-luggage services may be more secure. Free specialist maps showing cycle routes are published by Transport for London - 'London Cycling Guide 6' covers Terminals 1, 2 & 3 while 'London Cycling Guide 9' covers Terminal 4 (as of the June 2007 revision).

One coach on each Heathrow Connect train has an area reserved for wheelchairs and bicycles (wheelchairs have priority). Heathrow Express trains have space for three bicycles. There are rush-hour restrictions: unfolded bicycles are not allowed on trains due to arrive at Paddington between 07:45 and 09:45, or departing between 16:30 and 18:30, Monday to Friday.

If luggage and conditions permit, it is much cheaper (about one third the price) to travel by train between Paddington and Hayes & Harlington and then cycle the remaining two miles (3 km).

[edit] Future expansion

The major airlines at Heathrow, in particular British Airways, have long advocated construction of a new third runway at Heathrow. A sixth terminal would be likely to accompany the new runway, and the airport's capacity would be increased to 115 million passengers per year. On 16 December 2003 Transport Secretary Alistair Darling released a white paper[78] on the future of air transport in the UK. A key proposal of the paper was that a new 2000 metre runway suitable for use only by short-haul aircraft would be built at Heathrow by 2020[79] provided that targets on environmental issues such as aircraft noise, traffic congestion and pollution could be met.

In December 2006 the DFT published a progress report on the strategy which confirmed the original vision,[80][81] and in November 2007 the government started a public consulation on proposals for a longer 2,500 metres (2,734 yd) third runway. However proposed flight paths show integration from runway 3 into longhaul west bound routings suggesting that the desired length will eventually be similar to that of the existing runways.[82][83] The consultation process includes proposals to remove the existing runway alternation for landings, and also to allow departures from both runways over London (previously banned under the Cranford Agreement) when wind direction requires. If approved, the new runway would open around 2020.

The proposed outline of the third runway in 2030 can be seen on this map published by BAA and annotated by Hillingdon Borough Council, and also on a Google overlay map.

[edit] Opposition

The continued expansion of Heathrow Airport is opposed[84] by environmental campaigners who are concerned about increases of CO2 emissions,[85] by Londoners concerned about noise[86] and local residents concerned about their communities.[87]

Locally some 700 homes, a church and eight grade II listed buildings would have to be demolished or abandoned, the high street in Harmondsworth split, a graveyard "bulldozed" and the "entire village of Sipson could disappear".[88] John McDonnell, MP for Hayes and Harlington has suggested that up to 4,000 houses would actually have to be demolished or abandoned, however aviation minister Jim Fitzpatrick defended the plans, saying anyone evicted from their home as a result of expansion would be fully compensated[89] and BAA have committed to preserving the Grade I listed church and tithe barn at Harmondsworth, and have assured protection of the value of properties blighted by a possible third runway.[90]

The government has been criticised for working too closely with BAA in designing tests to determine whether noise and air pollution caused by the proposed runway would exceed designated limits. However the Department for Transport defended the co-operation, stating that "it wouldn’t be sensible or indeed possible to do the work without the expertise of the airport operator."[91]

The World Development Movement has claimed that the proposed additional flights from Heathrow’s third runway would emit the same amount of CO2 per year as the whole of Kenya.[92] Ruth Kelly, Transport Secretary, has stated that carbon emissions will not actually rise overall in the environment since carbon trading will be used to ensure that these increases from Heathrow are offset by reductions elsewhere in the economy.[93] However Friends of the Earth claim that "Plans to bring aviation into the EU Emissions Trading Scheme (ETS) will barely affect the rapid growth in aviation’s carbon emissions".[94]

A protest camp, the Camp for Climate Action, took place close to the airport in August 2007 and attracted some 2000 protesters,[95] along with considerable media attention.[96] Prior to the camp's start, BAA had attempted to get court approval for an injunction to limit their right to protest which became known as the "Mother of all Injunctions".[97] BAA said the injunction was intended to protect the security of staff and passengers[98] and that "flights and passengers were unaffected by the camp".[99]

In response to campaigning and proposed new legislation that would restrict aviation growth, BAA and others launched Flying Matters "to represent the travel industry over climate change".[100]

Since the 1970s, there have been proposals to replace Heathrow by a new airport located in the Thames Estuary.[101] Proponents of these schemes argue that flights would no longer arrive or depart over densely populated areas of London, and costs are estimated at two billion pounds, less than the construction of a third runway at Heathrow.[citation needed] However, surface access to London and the South-East of England would be more difficult than at Heathrow, and the area proposed is in the path of migratory bird routes which could cause safety concerns for aircraft, as well as the destruction of natural habitats.[citation needed]

[edit] Airlines and destinations

[edit] Terminal 1

  • Aer Lingus (Belfast-International, Cork, Dublin)
  • Asiana Airlines (Seoul-Incheon)
  • bmi (Aberdeen, Addis Ababa, Aleppo, Almaty, Amman, Amsterdam, Ankara, Baku, Beirut, Belfast-City, Bishkek, Brussels, Cairo, Damascus, Dammam, Dublin, Durham Tees Valley, Edinburgh, Ekaterinburg, Freetown, Glasgow-International, Hanover, Istanbul, Jeddah, Jersey, Khartoum, Leeds/Bradford, Lyon, Manchester, Moscow-Domodedovo, Naples [seasonal], Palma de Mallorca, Riyadh, Tbilisi, Tehran-Imam Khomeini, Tel Aviv, Venice, Yerevan)
    • bmi Regional (Aberdeen, Edinburgh, Glasgow-International, Leeds/Bradford, Manchester)
  • British Airways (Barcelona, Helsinki, Lisbon, Madrid, Nice)
  • Cyprus Airways (Larnaca, Paphos)
  • El Al Israel Airlines (Ovda [seasonal], Tel Aviv)
  • Finnair (Helsinki)
  • Icelandair (Reykjavik-Keflavik)
  • LOT Polish Airlines (Warsaw)
  • South African Airways (Cape Town, Johannesburg)
  • Transaero (Moscow-Domodedovo)
  • US Airways (Philadelphia)

[edit] Terminal 2

[edit] Terminal 3

[edit] Terminal 4

  • Air Malta (Luqa)
  • British Airways (Abu Dhabi, Accra, Bahrain, Baltimore/Washington, Bangkok-Suvarnabhumi, Boston, Buenos Aires-Ezeiza, Calgary, Chennai, Chicago-O'Hare, Dallas/Fort Worth, Dar es Salaam, Delhi, Denver, Dhaka, Doha, Dubai, Entebbe, Grand Cayman, Houston-Intercontinental, Hyderabad [begins 27 October][102], Islamabad, Kolkata, Kuwait, Luanda, Lusaka, Mexico City, Montréal, Mumbai, Muscat, Nairobi, Nassau, Newark, Philadelphia, Port Louis, Providenciales, Rio de Janeiro-Galeão, São Paulo-Guarulhos, Seattle/Tacoma, Shanghai-Pudong, Singapore, Sydney, Tel Aviv, Toronto-Pearson, Washington-Dulles)
  • China Southern Airlines (Beijing) [begins March, 2009][103]
  • Continental Airlines (Houston-Intercontinental, Newark)
  • Delta Air Lines (Atlanta, New York-JFK)
  • Kenya Airways (Nairobi)
  • KLM Royal Dutch Airlines (Amsterdam)
  • Northwest Airlines (Detroit, Minneapolis/St. Paul, Seattle/Tacoma)
  • Qantas (Bangkok-Suvarnabhumi, Hong Kong, Melbourne, Singapore, Sydney)
  • Sri Lankan Airlines (Colombo, Malé)
  • TAM Airlines (São Paulo-Guarulhos, Salvador [seasonal])

[edit] Terminal 5

  • British Airways (Aberdeen, Abuja, Algiers, Amsterdam, Athens, Bangalore, Basel/Mulhouse, Beijing, Belgrade, Berlin-Tegel, Brussels, Bucharest-Otopeni, Budapest, Cairo, Cape Town, Copenhagen, Düsseldorf, Edinburgh, Frankfurt, Geneva, Glasgow-International, Hamburg, Hong Kong, Hyderabad [begins 27 October], Istanbul-Atatürk, Johannesburg, Kiev-Boryspil, Lagos, Larnaca, Los Angeles, Lyon, Malaga, Manchester, Miami, Milan-Linate, Milan-Malpensa, Moscow-Domodedovo, Munich, Newcastle, New York-JFK, Oslo, Paris-Charles de Gaulle, Phoenix, Prague, Rome-Fiumicino, St. Petersburg, San Francisco, Sofia, Stockholm-Arlanda, Stuttgart, Tripoli, Tokyo-Narita, Vancouver, Venice [begins 26 October][104], Vienna, Warsaw [begins 27 October], Zürich)

[edit] Terminal rearrangements

Now that Terminal 5 is open, the allocation of airlines to terminals at Heathrow will undergo major changes. The new arrangements will largely be based around which alliance each airline belongs to. The transfer will be completed over a period of 10 months starting from March 2008.[105][106]

  1. On the 27 March 2008, all of British Airways shorthaul flights from Terminal 4, all longhaul flights from Terminal 1, all shorthaul flights from Terminal 1 , except Madrid, Barcelona, Nice, Helsinki, Belfast, Cork, Dublin and Lisbon will move into Terminal 5.
  2. On the 30 March 2008, Delta, Northwest and Continental Airlines will move to Terminal 4. British Airways flights to and from Dallas / Ft Worth and Houston will operate from Heathrow Terminal 4 after moving from London Gatwick. American Airlines daily flight to Raleigh / Durham and one of the Dallas / Ft Worth flights will move to Heathrow Terminal 3 from London Gatwick.
  3. On the 13 April 2008, American Airlines will transfer its remaining flight from London Gatwick to Dallas / Ft Worth to London Heathrow Terminal 3.
  4. On the 5 June 2008, British Airways flights to and from New York JFK, Abuja, Bangalore, Beijing, Cairo, Cape Town, Lagos and Phoenix will move from Terminal 4 to Terminal 5.
  5. On the 10 June 2008, Air New Zealand and United Airlines will move from Terminal 3 to Terminal 1.
  6. On the 17 September 2008, British Airways remaining flights in Terminal 1 will move to Terminal 3, along with Finnair and Iberia. British Airways longhaul flights to Abu Dhabi, Accra, Bahrain, Baltimore, Buenos Aires, Chicago, Dallas / Fort Worth, Dar Es Salaam, Doha, Entebbe, Grand Cayman, Houston, Kuwait, Luanda, Lusaka, Mauritius, Mexico City, Mumbai (Bombay), Muscat, Nairobi, Nassau, Newark, Philadelphia, Providenciales, Rio de Janeiro, Sao Paulo, Tel Aviv, Toronto, Washington-Dulles will move from Terminal 4 to Terminal 5.
  7. On the 26 October, British Airways flights to Boston, Calgary, Chennai, Delhi, Denver, Dhaka, Dubai, Islamabad, Kolkata (Calcutta), Montreal, Seattle and Shanghai will move from Terminal 4 to Terminal 5.
  8. In November 2008, Austrian Airlines, Croatia Airlines, Lufthansa and TAP Portugal will move from Terminal 2 to Terminal 1.
  9. In early 2009, British Airways flights and Qantas flights will move from Terminal 4 to Terminal 3, finalizing the oneworld moves making the whole alliance at terminals 3 & 5.
  10. In spring 2009, Aeroflot, Air France, Alitalia, CSA and Korean Air will move to Terminal 4, making the whole Skyteam alliance at Terminal 4.
  11. In 2012, the rest of Star Alliance at Heathrow will move to Terminal 1, finalising the "Star Alliance under one roof" project, while all other non-aligned airlines will move into Terminal 4.

After these moves, but before Heathrow East opens, Heathrow Terminal arrangements will be as follows:

  • Terminal 1: Star Alliance
  • Terminal 2: Will be demolished and replaced by Heathrow East Terminal
  • Terminal 3: Oneworld, British Airways flights to and from Madrid, Barcelona, Nice, Helsinki, Lisbon, Bangkok, Singapore, Sydney, Aer Lingus and Virgin Atlantic
  • Terminal 4: Skyteam and all non-aligned airlines
  • Terminal 5: All British Airways flights except Madrid, Barcelona, Nice, Helsinki, Lisbon, Bangkok, Singapore and Sydney.

[edit] Notes

  1. ^ Aircraft Movements, Terminal and Transit Passengers
  2. ^ Busiest Airports - The Busiest Airports in the World
  3. ^ UK airports owned and operated by BAA
  4. ^ BAA: "Who owns us?"
  5. ^ BAA Terminal 5: Heathrow East
  6. ^ CAA Aerodrome Licence
  7. ^ a b John Arlidge (June 3, 2007). Heathrow's Terminal 5 velocity. The Times. Retrieved on 2007-06-14.
  8. ^ Harold Balfour (later Lord Balfour), then Under-Secretary of State for Air (1938-1944), wrote in his 1973 autobiography Wings over Westminster, that he deliberately deceived the government committee that a requisition was necessary in order that Heathrow could be used as a base for long-range transport aircraft in support of the war with Japan. In fact, Balfour wrote that he always intended the site to be used for civil aviation and used a wartime emergency requisition order to avoid a lengthy and costly public inquiry.
  9. ^ Wimpey - The First 100 Years: page 28
  10. ^ What's In A Name? (HTML). www.thisislongford.com. Retrieved on 2006-08-13.
  11. ^ a b Heathrow Terminal Three Information
  12. ^ British Pathe news reel 31.10 dated June 1955 (www.britishpathe.com)
  13. ^ Air Ministry and Ministry of Civil Aviation: Records (R Series Files) BT 217/551
  14. ^ BAA Heathrow: Our History. BAA. Retrieved on 2007-11-11.
  15. ^ The Economist, The man who bought trouble. Consulted on July 18, 2007.
  16. ^ BAA's UK airports Consulted on 23 October, 2007.
  17. ^ http://www.timesonline.co.uk/printFriendly/0,,1-46-597343,00.html
  18. ^ Aviation Safety Network G-AHPN
  19. ^ ASN Aircraft accident description Vickers 951 Vanguard G-APEE - London-Heathrow Airport (LHR)
  20. ^ George Cross Database - GC facts and statistics
  21. ^ Women awarded the George Cross
  22. ^ Aviation Safety Network G-AMAD
  23. ^ Accident to G-VSKY. Air Accidents Investigation Branch.(PDF)
  24. ^ Heathrow closed after aircraft lands short of runway
  25. ^ "Airliner Crash-Lands at Heathrow", BBC News, 18 January 2008. Retrieved on 2008-01-18. 
  26. ^ Heathrow Airport History. Milesfaster.co.uk. Retrieved on 2008-05-31.
  27. ^ "Brinks Mat gold", BBC News, 2000-04-15. Retrieved on 2008-05-31. 
  28. ^ "Assad engages politics of politeness", BBC News, 2002-12-16. Retrieved on 2008-05-31. 
  29. ^ Henderson, Scott (1998). Silent Swift Superb: The Story of the Vickers VC10. Newcastle-upon-Tyne: Scoval, 130. ISBN 1-901125-02-5. 
  30. ^ "$3m heist at Heathrow", BBC News, 2002-03-19. Retrieved on 2008-05-31. 
  31. ^ Archive copy at the Internet Archive Wayback Machine
  32. ^ "Climate protest on Heathrow plane", BBC News, 2008-02-25. Retrieved on 2008-05-31. 
  33. ^ "Man arrested over Heathrow alert", BBC News, 2008-03-13. Retrieved on 2008-05-31. 
  34. ^ CAA Passenger Route Analysis 2006
  35. ^ a b "Terminal 5 second satellite building due to open in 2010", BBC News, 2008-03-11. Retrieved on 2008-03-27. 
  36. ^ a b c d "Debut A380 flight lands in London", BBC News, 2008-03-18. Retrieved on 2008-03-19. 
  37. ^ "Super Jumbo Makes A Flying Visit", Sky News, 2006-05-18. Retrieved on 2008-05-31. 
  38. ^ Airport CoOrdination Ltd (February 2002). "Submission to the CAA Regarding Peak Periods at Heathrow". Retrieved on 2008-01-13.
  39. ^ "BA boss joins attack on Heathrow", BBC, August 1, 2007. Retrieved on 2007-10-28. 
  40. ^ "Heathrow voted world's least favourite airport", The Daily Telegraph, October 30, 2007. Retrieved on 2007-10-30. 
  41. ^ "Landing at Heathrow", BBC, 2008-01-18. Retrieved on 2008-01-20. 
  42. ^ BAA Heathrow (2004/05). "Flight Evaluation Report 2004/05". Retrieved on 2007-11-02.
  43. ^ In westerly operations, aircraft continue to operate in a westerly direction with up to a 5-knot (9.3 km/h) easterly tailwind.
  44. ^ Night noise. Retrieved on 2007-10-30.
  45. ^ France, Anthony. "Exposed: Scandal Of Heathrow Security", Evening Standard, 2001-04-26. Retrieved on 2006-08-13. 
  46. ^ Heathrow, Gatwick and Stansted
  47. ^ Biggest IATA attacks higher landing charges at British airports. Retrieved on 2008-03-14.
  48. ^ "American, BA drop alliance plans", CNN Money, 2002-01-25. Retrieved on 2008-05-31. 
  49. ^ BAA Heathrow Home Page. BAA. Retrieved on 2007-11-24.
  50. ^ Passenger Traffic 2006 FINAL. Airports Council International. Retrieved on 2007-08-09.
  51. ^ Traffic Movements 2006 FINAL. Airports Council International. Retrieved on 2007-08-09.
  52. ^ Cargo Traffic 2006 FINAL. Airports Council International. Retrieved on 2007-08-09.
  53. ^ BAA Heathrow: Mixed mode. BAA. Retrieved on 2007-11-11.
  54. ^ BA pushes for 'mixed mode' at Heathrow. UK-Airport-News.info. Retrieved on 2008-05-31.
  55. ^ Heathrow is defeated in its attempt to ban environmental campaigners. The Times (2007-08-07). Retrieved on 2007-08-09.
  56. ^ Passenger Traffic for past 12 months. Airports Council International. Retrieved on 2007-08-09.
  57. ^ Vulnerable to foreign competition. BAA. Retrieved on 2007-08-09.
  58. ^ UK Airport Statistics: 2007 - annual. Civil Aviation Authority. Retrieved on 2008-05-31.
  59. ^ a b Redevelopment of Terminals 3 and 4. BAA Plc. Retrieved on 2008-02-21.
  60. ^ Donne, Michael. "The battle of Heathrow", Financial Times, 1982-01-12, p. 16. Retrieved on 2007-04-05. 
  61. ^ Fagan, Mary. "BAA presses on with Heathrow fifth terminal", The Independent, Newspaper Publishing, 1992-05-13, p. 5. Retrieved on 2007-04-05. 
  62. ^ Bray, Roger. "Plans are ready for huge fifth Heathrow terminal", Evening Standard, Associated Newspapers, 1993-02-17, p. 5. Retrieved on 2007-04-05. 
  63. ^ The inquiry, based at the Renaissance Hotel Heathrow, was the longest planning inquiry ever held in the UK.
  64. ^ Heathrow Terminal 5 Inquiry. Retrieved on 2007-11-02.
  65. ^ Heathrow Terminal 5: retail destination or gateway to Britain?. Brandrepublic (March 14, 2008). Retrieved on 2008-03-28.
  66. ^ Airport casts pods in future transport role. Railway Gazette International (December 20, 2007). Retrieved on 2007-12-20.
  67. ^ BAA Terminal 5: Project Overview
  68. ^ "Queen opens new Heathrow Terminal", BBC, 2008-03-14. Retrieved on 2008-03-14. 
  69. ^ BAA Terminal 5
  70. ^ "Baggage halted at new £4.3bn T5", BBC News, 2008-03-27. Retrieved on 2008-03-27. 
  71. ^ 28,000 bags caught in T5 foul-up
  72. ^ British Airways reveals what went wrong with Terminal 5. Computer Weekly (May 14, 2008). Retrieved on 2008-05-17.
  73. ^ "BA postpones long-haul move to T5", BBC News, 2008-04-11. Retrieved on 2008-05-17. 
  74. ^ Terminal 5: Heathrow East
  75. ^ Telegraph: Sparks Fly over Heathrow Upheaval
  76. ^ baa.com.
  77. ^ "Green light for Heathrow terminal", BBC, 2007-05-31. Retrieved on 2008-03-14. 
  78. ^ The Future of Air Transport (pdf) (2003-12-01).
  79. ^ Map showing proposed third runway outline.
  80. ^ "UK Government review backs London Heathrow and London Stansted airport strategy", Flight International, December 14, 2006. Retrieved on 2007-12-08. 
  81. ^ Air Transport White Paper Progress Report 2006. Retrieved on 2007-12-08.
  82. ^ "Industry backs third Heathrow runway as consultation opens", Flight International, November 22, 2007. Retrieved on 2007-12-08. 
  83. ^ Heathrow third runway length increased by 25 percent (2007-11-24).
  84. ^ HACAN Clearskies. Hacan. Retrieved on 2007-12-23.
  85. ^ Campaign to stop Heathrow expansion takes to the roads. The Telegraph (2007-08-13). Retrieved on 2007-12-23.
  86. ^ Third runway noise will hit North London. This Is London (2007-11-23). Retrieved on 2007-12-23.
  87. ^ No third runway action group. Retrieved on 2008-01-01.
  88. ^ Village faces being wiped off map. BBC News (2006-02-21). Retrieved on 2007-12-23.
  89. ^ Public 'misled' on number of homes lost for Heathrow. This Is London (2007-12-13). Retrieved on 2007-12-23.
  90. ^ A third runway.
  91. ^ ‘Secret pact’ over Heathrow’s third runway. The Times (2007-06-06). Retrieved on 2007-12-29.
  92. ^ Flights from Heathrow’s third runway will emit same amount of CO2 as Kenya. World Development Movement (2007-11-21). Retrieved on 2008-01-12.
  93. ^ Ben Webster (2007-12-01). Airlines to make billions from CO2 trade. The Times.
  94. ^ Aviation carbon trading plan will sell the climate short. Friends of the Earth. Retrieved on 2008-01-12.
  95. ^ Eco-village with a stark warning. BBC News (2008-08-13). Retrieved on 2007-12-23.
  96. ^ Google News: Search for "Climate Camp" "Heathrow" in 2007. Google News.
  97. ^ Joy for protesters as Heathrow is denied 'mother of all injunctions'. The Independent (2008-08-07). Retrieved on 2007-12-23.
  98. ^ Fred Attewill and agencies (2007-08-06). BAA wins injunction to stop Heathrow protest. The Guardian. Retrieved on 2008-01-01.
  99. ^ Campaigners leave Heathrow camp. BBC News. Retrieved on 2008-01-01.
  100. ^ Travel industry to launch climate-change lobby group. UK-Airport news (2007-07-23). Retrieved on 2007-12-23.
  101. ^ Halcrow Group Ltd. (December 2003). "Development of Airport Capacity in the Thames Estuary". Retrieved on 2008-02-12.
  102. ^ "British Airways to launch Hyderabad-London flight from October", Thaindian News, 2008-04-02. Retrieved on 2008-04-23. 
  103. ^ bloomberg.com.
  104. ^ New service from London Heathrow to Venice. British Airways. Retrieved on 2008-05-22.
  105. ^ "Heathrow looks ahead", Airports(Key Publishing), September/October 2007, P30
  106. ^ SkyTeam Carriers Will Operate Out of Terminal 4 at London Heathrow (Official Press Release: 6 June 2006)

[edit] External links

Wikimedia Commons has media related to:


aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - en - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu -