List of Caracas Metro stations
From Wikipedia, the free encyclopedia
The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela.
Below is a list of the Caracas Metro subway lines and the stations that they serve.
Contents |
[edit] Line 1 (Orange)
From west to east:
- Propatria
- Pérez Bonalde
- Plaza Sucre
- Gato Negro
- Agua Salud - Future point of transfer to Line 6.
- Caño Amarillo
- Capitolio - Point of transfer to Line 2.
- La Hoyada - Future point of transfer to Line 3.
- Parque Carabobo
- Bellas Artes
- Colegio de Ingenieros
- Plaza Venezuela - Point of connection to Line 3 and Line 4.
- Sabana Grande
- Chacaíto
- Chacao
- Altamira
- Parque del Este - Future point of connection to Line 4.
- Los Dos Caminos - Future point of trasfer to Line 6.
- Los Cortijos
- La California
- Petare
- Palo Verde
[edit] Line 2 (Green)
From north-east to south-west:
- El Silencio - Point of transfer to Line 1.
- Capuchinos - Point of connection to Line 4.
- Maternidad - Point of connection to Line 4.
- Artigas - Point of connection to Line 4.
- La Paz - Point of connection to Line 4.
- La Yaguara - Point of connection to Line 4.
- Carapita - Point of connection to Line 4.
- Antímano - Point of connection to Line 4.
- Mamera - Point of connection to Line 4.
- Caricuao
- Zoológico
- Ruiz Pineda - West ramification serviced exclusively by Line 4.
- Las Adjuntas - Serviced exclusively by Line 4, - transfer station to (Los Teques Metro).
[edit] Line 3 (Blue)
From north-east to south-west:
- Plaza Venezuela - Point of connection to Line 1 and Line 4.
- Ciudad Universitaria
- Los Símbolos
- La Bandera
- El Valle
- Los Jardines - expected completion and service by 2008.
- Coche - expected completion and service by 2008.
- Mercado - expected completion and service by 2008.
- La Rinconada - IAFE rail station, both completed and in service.
Next phase (project). Begins as a west ramification from El Valle station to north on San José station
- El Valle
- Prado de María
- El Peaje
- San Agustín
- Fuerzas Armadas - Point of transfer to line Line 1 and Line 4
- Urdaneta
- San José
[edit] Line 4 (Red)
Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Please note Line 4 was renamed and incorporated as part of Line 2 shortly after its inauguration.
- Capuchinos - Point of connection to Line 2.
- Teatros
- Nuevo Circo
- Parque Central
- Zona Rental - Point of connection with Line 1 and Line 3.
Next phase - From west to east:
- Bello Monte
- Las Mercedes
- Tamanaco - Future point of connection to Line 5.
- Chuao
- Bello Campo
- Parque del Este II - Point of connection to lines Line 1 and Line 6.
[edit] Line 5 (Magenta)
This line is still under project.
From north to south:
- Santa Ana
- Santa Paula
- San Luis
- Santa Marta
- Chuao
- Tamanaco - Point of transfer to Line 4
- San Román
- Santa Fe
- La Ciudadela
- Prados del Este
- La Iglesia
- Baruta
- La Trinidad
- La Boyera
- Los Geranios
- El Hatillo
[edit] Line 6 (Yellow)
Most of this line is still under project.
From west to east:
- Magallanes
- Gato Negro
- Agua Salud - Point of transfer to Line 1.
- Miraflores
- Urdaneta - Point of transfer to Line 3.
- San Bernardino
- Guaicaipuro
- Maripérez
- Las Palmas
- Chapellín
- La Castellana
- Ávila
- Santa Eduvigis' - Point of transfer to lines Line 1 and Line 4'
The following stations found in the City of Caracas are in construction under a project known as Guarenas / Guatire Metro.
- Parque del Este - Point of transfer to lines Line 1 and Line 4
- Montecristo - Point of transfer to line Line 1
- Boleíta
- Horizonte
- La Urbina Sur
- La Urbina Norte - Point of transfer to the Light Rail Service, Guarenas-Guatire
[edit] Los Teques Metro (Navy Blue)
- Las Adjuntas transfer station to Caracas Metro Line 4
- Alí Primera formerly El Tambor station
The following stations are in construction
- Guiacaipuro - projected completion date set for 2010
- Miranda - projected completion date set for 2010
- Los Cerritos - projected completion date set for 2012
- Carrizal - projected completion date set for 2012
- Las Minas - projected completion date set for 2012
- San Antonio - projected completion date set for 2012
[edit] Guarenas / Guatire Metro (Green Grass)
The following stations are in construction
- La Urbina Norte transfer point
- Caucaugüita - projected completion date set for 2012
- Tamarinda - future project
- Guarenas I - projected completion date set for 2012
- Guarenas II - projected completion date set for 2012
- Guatire I - projected completion date set for 2012
- Guatire II - projected completion date set for 2012