Guarenas / Guatire Metro
From Wikipedia, the free encyclopedia
This article or section contains information about a planned or expected public transportation infrastructure. It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the infrastructure approaches, and more information becomes available. |
Guarenas / Guatire Metro is a dual subway / light rail system project to connect the twin cities and intermediate communities to Caracas, Venezuela.
The 2 billion dollar project aimed to accommodate 125,000 daily users consists of 2 distinct parts the urban subway line and suburban light train line. Construction started on March 18, 2007 with a planned completion projected for late July 2012.
The 6.7 km (4.2 mi) urban line will start from the Caracas Metro Parque del Este II station and end at the Guaraira Repano (Petare Norte) station, while the 31.4 km (19.5 mi) suburban line will start from the Guaraira Repano station and end at the Guatire II station with future extensions already in the planning stage.
[edit] Lines
Subway line will have the following stations
- Parque del Este II
- Montecristo
- Boleita
- El Marques
- Guaraira Repano
Light Train line will have the following stations
- Guaraira Repano
- Caucaugüita
- El Tamarindo
- Guarenas I
- Guarenas II
- Guatire I
- Guatire II
[edit] See also
IAFE Venezuelan National Railway
[edit] External links
Urban Rail Systems in Venezuela | ||
---|---|---|
Caracas Metro | Guarenas / Guatire Metro | Los Teques Metro | Maracaibo Metro | Valencia Metro |