U.S. Grant Bridge (current)
U.S. Grant Bridge (current)
Current U.S. Grant Bridge carrying U.S. 23 over the Ohio River.
Carries 2 lanes of U.S. Route 23
Crosses Ohio River
Locale Portsmouth, Ohio and South Shore, Kentucky
Maintained by Ohio Department of Transportation
Design Cable-stayed bridge
Longest span 267 m (875 ft.)
Total length 657 m (2155 ft.)
Opening date October 16, 2006 at a cost of more than $28,434,495

The U.S. Grant Bridge is the name of the two bridges that carry and have carried traffic on US Route 23 between Portsmouth, Ohio and South Shore, Kentucky across the Ohio River in the United States. The original bridge was closed and demolished in 2001 and its replacement opened on October 16, 2006.

Contents

[edit] Current U.S. Grant Bridge

Contracts for the new U.S. Grant Bridge were given in the spring of 2001. Construction was expected to be complete in June of 2004, but work fell behind schedule due to inclement weather, unusual flooding of the Ohio River, and the partial sinking of a floating construction barge which carried one of the cranes used to work on the center span of the bridge. The date of completion was moved to October 16, 2006.

U.S. Grant Bridge under construction on June 21, 2005.
U.S. Grant Bridge under construction on June 21, 2005.

In addition, many downtown business owners were upset over the delays and often criticized the construction company, C.J. Mahan Construction Company, for delays on days when it was sunny and the river levels were average. It should be noted that the bridge was critically underdesigned and not constructable until C.J. Mahan stopped construction and awaited a near complete redesign by the design consultant.[citation needed] Another complaint was that this is the first major bridge project the construction company that was awarded the construction contract has worked on. However, C.J. Mahan has constructed other large bridges in Ohio and West Virginia. Local business owners demanded that ODOT pay local businesses US$8 million dollars in lost profit.

A view of the current bridge from the Kentucky side of the Ohio River
A view of the current bridge from the Kentucky side of the Ohio River

[edit] Original U.S. Grant Bridge

U.S. Grant Bridge (former)
Carries 2 lanes of U.S. Route 23
Crosses Ohio River
Locale Portsmouth, Ohio and South Shore, Kentucky
Maintained by Ohio Department of Transportation
Design Suspension bridge
Opening date 1927
Destruction date 2001
Toll tolls dropped in 1974

The original U.S. Grant Bridge was a suspension bridge. The bridge opened to traffic as a toll bridge in 1927. It wasn't until 1974 when the Ohio Department of Transportation bought the bridge from the Ohio Bridge Commission and removed the tolls. The U.S. Grant Bridge was the only automobile bridge in Scioto County to cross the Ohio River which became a nightmare when the bridge closed for repairs in 1978 which then reopened in 1980. However, Scioto County would have more arteries to cross with the Jesse Stuart Memorial Bridge opened in 1984 and the Carl Perkins Bridge opened in 1988.

In 1992, ODOT initiated a long-range study to determine whether to continue to rehabilitate the existing bridge or construct a new span. ODOT had spent $9 million from 1977 to 1996 by the time the study was completed to rehabilitate portions of the bridge. According to the study, rehabilitating the span would add only 20 useful years to the suspension bridge before rehabilitation would need to occur again and would cost nearly $30 million. It was found not cost-efficient to continuously rehabilitate the suspension bridge when a new structure would be cheaper in the long-run. The bridge continued to age and once again closed from repairs in 1994.

On July 3, 2001, the original suspension bridge was permanently closed to traffic and the entire structure was torn down within a few months.

[edit] See also

[edit] External links

[edit] References

  • "U.S. Grant Bridge Project Summary." Ohio Department of Transportation. 17 March 2004 [1].


aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - en - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu -