Severn Barrage

From Wikipedia, the free encyclopedia

Barrage locations considered over the years. Black indicates lines of most interest, with associated peak power generation at that location.
Barrage locations considered over the years. Black indicates lines of most interest, with associated peak power generation at that location.

The Severn Barrage is the name of a number of ideas for building a barrage from the English coast to the Welsh coast over the Severn tidal estuary. Ideas for damming or barraging the Severn estuary (and Bristol Channel) have existed since the 19th century. The purposes of such a project has typically been one, or several of: transport links, flood protection, harbour creation, or tidal power generation. In recent decades it is the latter that has grown to be the primary focus for barrage ideas, and the others are now seen as useful side-effects.

The building of such a barrage would be a huge engineering feat, comparable with some of the world's biggest construction projects. The huge size and cost of most of the ideas over the years are what have kept plans firmly on the drawing board.

Contents

[edit] Various projects

There have been numerous proposed projects over the years, some more rational than others.

[edit] Thomas Fulljames - 1849

Thomas Fulljames's own impression of his proposed Barrage
Thomas Fulljames's own impression of his proposed Barrage

Thomas Fulljames proposed a barrage from Beachley to Aust (now the site of the first Severn Bridge), a span of just over a mile. Since this was before serious electricity demand, the first proposals were based on the desire for a large shipping harbour in the Severn Estuary, and also railway transport and flood protection.

[edit] Study - 1925

In 1925 an official study group was commissioned. A scheme of 800 MW was proposed at English Stones and although considered technically possible, it was prevented on economic grounds (then costing £25 million).

[edit] Prototype - 1931

Paul Shishkoff, a Russian immigrant, demonstrated a 300 horsepower prototype tidal generator at Avonmouth. It included a novel mechanism for spreading the power output over 24 hours. The full barrage was estimated at £5 million at the time.

[edit] Severn Barrage Committee - 1933

In 1933 the Severn Barrage Committee Report (HMSO) recommended that a barrage across the English Stones area would be the best option.

[edit] Nazis - 1940s

The Nazis drew up plans for a barrage for after they had conquered Britain.[citation needed]

[edit] Study - 1948

The Government looked at barrage options. Cost estimated at £60 million.

[edit] Study - 1953

The Government looked at more barrage options. Cost now estimated at £200 million.

[edit] Tom Shaw - 1971

Tidal Power expert, Dr Tom Shaw, proposed a barrage from Brean Down to Lavernock Point. Estimated cost £500 million.

[edit] CEGB - 1975

In 1975 the Central Electricity Generating Board (CEGB), published a study with evidence from Bristol and Salford universities for the Secretary of State’s Advisory Council on Research and Development for Fuel and Power. As this was the era of cheap oil, the council established that a barrage could not be economically viable unless the energy situation deteriorated significantly.

[edit] Severn Barrage Committee - 1981

Proposed location of Bondi Committee Barrage
Proposed location of Bondi Committee Barrage

After just such a deterioration (due to the Iranian Revolution and oil shock) the plans were reinvestigated by the Severn Barrage Committee in 1981. This committee was known as the Bondi Committee (after Professor Sir Hermann Bondi). The committee investigated 6 possible barrage locations, from English Stones at the top of the estuary, down to a location largely at sea in the Bristol Channel between Lynmouth in North Devon and Porthcawl in South Wales. It produced a major energy paper,[1] which recommended a 10 mile (16 km) long barrage of concrete powerhouse between Brean Down and Lavernock Point, sluice and plain caissons together with sand and rock-fill embankments. It would have generated 7200 MW on the flow of the tides (the largest barrage considered could have produced double that power output). This set of plans was strongly built on a few years later by the Severn Tidal Power Group.

[edit] Wimpey Atkins - 1984

Wimpey Atkins proposed a smaller barrage at English Stones, in the hope of creating a smaller more economically viable project that would avoid the environmental impact of a large barrage.

[edit] Hooker Barrage - 1987

Cross section of Shoots Barrage turbine housing
Cross section of Shoots Barrage turbine housing

Arthur Hooker OBE (a former partner of WS Atkins) in conjunction with Parsons Brinckerhoff prepared a revised barrage proposed at English Stones to better tackle the issue of silting, after the earlier Wimpey Atkins scheme in the same location had been criticised by an STPG study for this reason.

Parsons Brinckerhoff further updated this proposal in 2006 and current estimates for this barrage (now known as the Shoots Barrage) would cost £1.4 to £1.8 billion to build, and generate 2.75 TWh of power per year. At the highest tidal range, it would develop a peak output of 1050 MW, and 313 MW output on average throughout the year. Thus the Shoots Barrage is about 1/7th of the size and cost of the STPG proposals.

Cross section of embankment
Cross section of embankment

The barrage would be located just below the Second Severn Crossing – i.e. above Cardiff and Bristol on the estuary – and so much smaller locks would be needed for upstream access to Sharpness and Gloucester docks as the large ports of Portbury and Avonmouth would be unaffected.

Like the STPG proposal, Hooker generates only on the ebb tide. Construction time would be four years. It would be built of rock fill embankment at the coastal sides (more like the proposals for "Tidal Lagoons"), but like the STPG would be sluice caissons and turbines with powerhouse in the middle section.

[edit] Severn Tidal Power Group - 1989

The £4.2 million study by Severn Tidal Power Group (STPG) built on the work of the Severn Barrage Committee, but also examined other possible barrages, and produced another major energy paper.[2] They concluded that the 1981 plans were the best location for a barrage, but calculated that the power output could be larger, at 8640 MW during flow, or 2000 MW average power. This would provide 17 TWh of power per year (about 6% of UK consumption), equivalent to about 18 million tons of coal or 3 nuclear reactors. The cost in 1989 was calculated to be about £8 billion (£12 billion in 2006 money – about the same as 6 nuclear reactors, but different lifespan), and running costs would be £70 million per year (about the same as 1.5 nuclear reactors).

Diagram of the STPG Barrage
Diagram of the STPG Barrage

The barrage would use existing technology as used in the Rance tidal barrage in France and the Dutch sea barrages. Power would be most efficiently generated only in the flow direction, and this effect on tidal range would mean that the tidal extent would be halved by losing the low tide rather than the high tide. That is, that the tide would only go out as far as the current tidal mid-point, but high tides would be unaffected (unless the barrage was deliberately closed to prevent a high-tide).

Construction in prefab caissons
Construction in prefab caissons

The barrage would contain 216 x 40 MW turbines for the 8640 MW total. Arrays of sluices would let the tide in and then close to force it out through the turbines after the tide has gone out some distance outside the barrage. This deliberate building of a head on the water builds pressure that makes the turbines more efficient.

Artist's impression of cross-section
Artist's impression of cross-section

The barrage would contain a huge set of shipping locks, designed to handle the largest container vessels. Construction would take about 8 years and would require 35,000 employees at peak build time. The minimum lifespan of the barrage would be 120 years (about 3 times that of a nuclear reactor), but could easily be 200 years if decent maintenance was performed.

Artist's impression of aerial view of STPG Barrage
Artist's impression of aerial view of STPG Barrage

The STPG appraisal concluded that the electricity generated from the barrage would make the scheme economically viable if given certain "green" advantages, and that the environmental impact was acceptable. Margaret Thatcher's government did not accept this, and shelved the plans. However, since then global warming has radically altered the public perception of environmental damage; and soaring oil, gas and energy costs have made the economics of the barrage much more favourable. The advent of renewable energy discounts favours electricity generated from "green" sources; and in addition, much lower interest rates make the cost of loans much lower, and long-term financing of such massive projects is now more viable. Consequently, there have been renewed calls for these plans to be re-appraised.

[edit] Gareth Woodham - 2006

In 2006 Gareth Woodham, a businessman from Neath in Wales, submitted plans to Sedgemoor District Council in the name of Combined Innovations Ltd for a barrage from Brean Down near Weston-super-Mare, to Lavernock Point near Cardiff.[3] According to Woodham, the barrage would feature 14 electricity generating turbines, a dual carriageway, a light railway, four marinas, and two lock gates to give ships passage. It would supply electricity for the whole of the South West, and according to Woodham it would cost about £650 million and take up to 20 years to complete.

However, it is not clear how Woodham's plans, which are more ambitious than those of the STPG, could be delivered for 1/20th of the cost.

[edit] Sustainable Development Commission - 2007

On 1 October 2007, the UK's Sustainable Development Commission (SDC) published a report looking at the potential of tidal power in the UK,[4][5] including proposals for a Severn barrage. The report draws on a series of five evidence-based reports, one of which summarises all the available evidence from previous studies on a number of Severn barrage options,[6] but focusing on the Cardiff-Weston and the Shoots schemes. The SDC also commissioned a programme of public and stakeholder engagement, which included a national opinion poll and a series of local and regional workshops. The results of this work are available in a separate report.[7]

The SDC gave its support to the building of a Severn barrage, providing a number of strict conditions were met. These include:

  • A Severn barrage should be publicly led as a project and publicly owned as an asset to avoid short-term decisions and ensure the long-term public interest
  • Full compliance with the EU Habitats and Birds Directives is vital, as is a long-term commitment to creating compensatory habitats on an unprecedented scale
  • Development of a Severn barrage must not divert Government attention away from much wider action on climate change

The SDC also raised the challenge of viewing the requirement for compensatory habitat as an "environmental opportunity", through the potential to combine a climate change mitigation project with the adaptation that will be required to respond to the effects of climate change. A publicly led project would enable the use of a low discount rate (2%), which would result in a competitive cost of electricity, and would limit the economic impact of even a very large-scale compensatory habitats package. Electricity production costs are not competitive if a commercial discount rate is applied.

[edit] UK Government study announced - 2007

John Hutton, Secretary of State for Business, Enterprise and Regulatory Reform, announced a further feasibility study on 25 September 2007 to follow on from the report by the Sustainable Development Commission. The proposal for a hydro-electric barrier to generate 8.6 GW and meet five percent of Britain's power needs, is being opposed by some environmental groups.[8][9]

The new study will cover; social and economic aspects, including public acceptability, environmental impacts and how these could be mitigated, financing, risk and organisation of such a project, including impacts on the energy market, technical and engineering aspects, regional impacts / infrastructure, including transport implications, planning, consents and other regulatory issues and the potential for other UK tidal power projects.[10][11]

The study is expected to last roughly two years, with the cost estimated at around £9 million. It will be split into two stages with a decision point at the end of each. The first, which is likely to run until late 2008, will focus on high level issues and reach an initial view on whether there are any fundamental issues that would preclude a tidal scheme in the Severn Estuary. Subject to the decision at the end of the first phase, the second phase will look at the issues in more detail and culminate in a full public consultation in early 2010. [1]

[edit] Benefits and Disadvantages

[edit] Benefits

  • Predictable source of "green" energy during lifetime of barrage
  • Home-grown facility, independent of foreign uncertainties
  • Flood protection for the vulnerable Severn estuary, including against global warming sea level rises
  • Transport links for road and/or rail
  • Better shipping and boating conditions behind the barrier
  • Boost to local economy - construction industry in the short term, tourism and infrastructure in the long term[citation needed]
  • Reduced turbidity (cloudiness) of water will improve the density and spread of invertebrate colonies in the estuary. This should lead to better carrying capacity for migratory fish and birds. (evidence needed to substantiate this statement as a barrage would lead to large losses of intertidal mudflats (bird feeding grounds) and a barrage could be a physical obstacle to migratory fish)

[edit] Disadvantages

  • Existing ecosystems would be heavily altered, with new species moving in and perhaps dominating old species
  • Some of the low-tide mud-flats would be lost, displacing some of the wading birds that make the estuary a protected area
  • Lack of industry skill in the UK of a project of this size.
  • Likely to stimulate silting in some areas and coastal erosion in others
  • Enhance flood risk on the seaward side because only a proportion of the water that presently flows up stream will pass through the barrage leaving the remainder to rise up outside possibly raising levels by as much as a metre.
  • Shipping would have to navigate locks
  • Costs associated with navigating the locks would impact trade and commerce
  • Severn bore weakened
  • All industrial discharges into the River Severn (e.g. from Avonmouth) will have to be reassessed.
  • Negative visual impact upon the landscape (subjective, c.f. Wind turbines)
  • Huge amount of concrete (etc.) needed - quarrying of stone likely to inpact on other areas.
  • Cost of build would mean the buy back time would be considerable and the barrage may only have a finite life span due to silting up behind barrage negating the "green" element.

[edit] Dangers

Unlike river dams, there is no danger associated with collapse of a tidal barrage. If a freak earthquake (or a ship collision) were to break the barrage, the water would flow out (or in) at the speed of the tide, just as it does now, and just as it would during construction. This would only represent a danger to those caught directly in the current, as it does now.[citation needed]

[edit] Environmental impact

The Severn Estuary is a Special Area of Conservation due to the European importance of its ecology. The inter-tidal area provides food for over 85,000 migratory and wintering water birds, and represents 7% of the UK's total estuaries.[12] There are nature reserves and Site of Special Scientific Interest (SSSI) on the islands of Flat Holm and Steep Holm.

The Barrage was not supported in the 2003 Energy Review due to "strong environmental concerns" (The same paper also described nuclear power as "an unattractive option").[13]

The RSPB opposes any Severn Barrage because of the effect it will have the feeding grounds 85,000 birds depend on, stating "The impact a barrage would have is huge. This is one of the most important sites in the UK for wild birds and the chances of them surviving if it went ahead are fairly slim. There wouldn't be enough room left for all the birds and there wouldn't be enough food for those that remained. The estuary is one of the UK's most important sites for water birds and its wildlife value must be taken fully into account."[14]

Possible effect of turbidity reductions in Severn Estuary
Possible effect of turbidity reductions in Severn Estuary

The present strong tidal currents in the estuary serve to lift up silt sediment and so keep the water thick with fine particles. This blocks light-penetration and means that the Severn Estuary marine environment is actually a relative desert, in terms of both plant and fish life.[15]

The barrage will not create a "lagoon" - as both opponents and supporters have sometimes claimed. Tidal power stations by definition require that the tide flows through the barrage, but the tidal range in the Severn would be halved.[16]

DEFRA claims that the environmental effects of the barrage still need more analysis before final conclusions can be drawn. The Sustainable Development Commission is investigating UK tidal resources, including tidal power in the Severn Estuary and its environmental impact, and should report mid-2007.[17]

[edit] Tidal lagoon alternative

Friends of the Earth support the idea of tidal power, but oppose barrages because of the environmental impact. They have proposed their own plans based on the concept of tidal lagoons,[18] whereby man-made lagoons in the estuary would fill and drain through turbines. Their proposals would include lagoons covering up to 60% of the area covered by the barrage, which in some smaller configurations would not impound water in the ecologically sensitive inter-tidal areas of the estuary. The lagoons could be sub-divided so power would be generated at more states of the tide than a barrage, with lower peak output, giving economic advantages to set against the higher construction cost of longer barriers. This idea is based on a prototype now being designed at Swansea bay. However leading figures in the construction industry are sceptical that the lagoons can be economic.[19] [2]

A set of Tidal lagoons known as the "Russell Lagoon concept" were studied and dismissed by the 1981 Bondi Committee report, rejected on the grounds of both economics and environmental damage. Studies suggested that tidal currents around and between the lagoons would become extremely fierce and damaging.

[edit] Effects of different site locations

One of the complicating factors in assessing the impacts of a barrage is the large number of possible locations and sizes for the barrage. Generally, the larger the barrage the bigger its environmental impact, and the bigger the amount of energy it could create - and therefore the bigger carbon offset it could have by way of its renewable power generation.

The largest barrages (sited beyond Hinkley Point and towards Minehead on the English side and Aberthaw on the Welsh side) would significantly affect the entire Severn Estuary and much of the Bristol Channel, but could generate 15 GW peak power and protect the whole of the Somerset levels against flooding and sea-level rise caused by Global Warming. The smallest barrages (sited at Aust/Chepstow) would affect only the river and estuary in Gloucestershire, but would also only generate perhaps 0.75 GW peak power.

[edit] Construction costs

The estimated costs of the most recent plans are huge. Figures are generally in the £10-15 billion range, but have gone as high as £23 billion.[20] However, the recent plans have assumed that the project would be privately financed, and so in effect the matter of cost becomes a private one between the building consortium and their banks. If the banks feel that the project is viable and decide to lend the money then the projects will go ahead. None of this cost would directly fall on the tax-payer. There would though be secondary knock-on costs from the barrage that might be met by the tax-payer, such as modifying existing ports and dealing with environmental change. However, these would be offset by the positive knock-on effects, such as transport links and flood protection - which would have otherwise also cost tax-payer money. Whether the parties actually decided to exchange monies for these knock-on effects would be a matter for Government negotiation.

[edit] Vested interests

It has been suggested[who?] that powerful construction industry based vested interests are the main force behind Severn Barrage proposals. Clearly, any project with a budget of several billion pounds will rouse numerous vested interests both for and against it. However, in order to understand where the vested interests might lie, it is necessary to see the wider picture. The alternative to any Severn Barrage would probably be three nuclear power stations; and these are huge facilities that would have to be built by someone - the same construction industry that stands to gain from the barrage. Friends of the Earth state that their proposals for "lagoons" would require 20 times as much construction material as the Barrage to build, and so should be even more desirable for the construction industry if driven by vested interests. In the end, the vested interests of those wanting the Barrage built will come up against the vested interests of those who do not want it built; and these include not only bird protection and environmental groups, but also the nuclear and oil industries.

[edit] Trans-barrage transport links

It is likely that a barrage would be used for transport links between England and Wales, and more specifically the areas around Bristol and Cardiff. Various proposals include a dual carriageway road giving a further crossing in addition to the Second Severn Crossing and the Severn Bridge. The road would have to be taken over the sea locks on a bridge at a height of the Bridge of the Americas if the locks are Panamax-sized.

Some proposals also include a double track railway line across the barrage. A railway would have a longer approach up to a fixed bridge over the locks. The approach would be greatest for non-electrified heavy railway capable of taking freight, slightly less for non-electrified passenger line, and less still for electrified passenger line. However, there is no electrification in the Bristol or Cardiff areas. An alternative to a fixed bridge would be a swing bridge, though there is concern expressed at this reducing capacity through the locks and on the railway. However, two swing bridges, one at either end of the lock would mean that one bridge could be kept open to railway traffic at all times. The double track could be reduced to single track at this point without creating too much of a bottleneck, or if double track is required this could be worked around by grade separating the two lines and having double-decked bridges. The line could then be used to partially relieve the Severn Tunnel.

[edit] Opinions

[edit] Backers

[edit] Opponents

[edit] See also

[edit] References

  1. ^ "Tidal power from the Severn Estuary"-Volume 1: Energy Paper 46; HMSO 1981.
  2. ^ "The Severn Barrage Project: General Report": Energy Paper 57; HMSO 1989.
  3. ^ Severn Lake Official Website
  4. ^ Sustainable Development Commission UK (SDC): Tidal Power
  5. ^ BBC NEWS | Science/Nature | Advisers endorse tidal power plan
  6. ^ Sustainable Development Commission UK (SDC): Tidal Power in the UK - R3 - Severn Barrage Proposals
  7. ^ Sustainable Development Commission UK (SDC): Tidal Power: Public and Stakeholder Engagement Report
  8. ^ Severn Barrage study alarms campaigners. Times Online (25 September 2007). Retrieved on 2007-09-26.
  9. ^ New study for Severn energy plan. BBC News (25 September 2007). Retrieved on 2007-09-26.
  10. ^ John Hutton calls for open minds on the future of the Severn barrage. Government New Network. Retrieved on 2007-09-26.
  11. ^ Severn tidal power study could unlock massive renewable potential. BERR (22 January 2008). Retrieved on 2008-01-25.
  12. ^ Friends of the Earth: Press Releases: Severn Barrage is not the answer
  13. ^ BERR - Redirect
  14. ^ Barrage bad for birds
  15. ^ Kirby, R. and Shaw, T.L. (2004) "Severn Barrage, UK – environmental reappraisal" Proceedings of the Institute of Civil Engineering.
  16. ^ Barrage bad for birds
  17. ^ Defra, UK - About Defra - Ministers' speeches: Speech by Ben Bradshaw MP
  18. ^ A Severn barrage or tidal lagoons? A comparison (PDF). Friends of the Earth Cymru (January 2004). Retrieved on 2007-10-01.
  19. ^ Tidal Lagoon Power Generation Scheme in Swansea Bay (PDF). Department of Trade and Industry and the Welsh Development Agency (April 2006). Retrieved on 2007-10-01.
  20. ^ "Severn barrage cost hits £23bn", QS Week, 2008-05-19. Retrieved on 2008-05-23. 
  21. ^ BLAIR BACKS SEVERN BARRAGE
  22. ^ BBC NEWS | Wales | Experts disagree on river barrage
  23. ^ ePolitix.com - John Penrose
  24. ^ UK Parliament - Early Day Motions By Details
  25. ^ thisisbristol.co.uk
  26. ^ The Webb log: Time to put some energy into power from the Severn
  27. ^ House of Commons Hansard Debates for 4 Feb 2003 (pt 5)
  28. ^ BACKING FOR £14BN TIDAL BARRAGE BID
  29. ^ Estuary energy plan makes waves | Special Reports | Guardian Unlimited Politics
  30. ^ UK Parliament - Early Day Motions By Details
  31. ^ UK Parliament - Early Day Motions By Details
  32. ^ Agendas, Minutes and Reports
  33. ^ BBC NEWS | Wales | Experts disagree on river barrage
  34. ^ Defra, UK - About Defra - Ministers' speeches: Speech by Ben Bradshaw MP
  35. ^ Tide turns in favour of Severn Barrage electricity - Telegraph
  36. ^ Ministers support Severn Barrage
  37. ^ Greens welcome Severn Barrage bid - but not for its merits
  38. ^ Gloucestershire Green Party - towards a just, equitable and sustainable society
  39. ^ Green Party South West - Southwest Greens support Tidal Power in Severn Estuary
  40. ^ a b Estuary energy plan makes waves, The Guardian, April 26 2006
  41. ^ BBC NEWS | Wales | Concern over Severn barrage plan
  42. ^ thisisbristol.co.uk
  43. ^ The Severn Estuary a very special place
  44. ^ BBC NEWS | Wales | Monbiot attacks Welsh energy plan

[edit] External links


aa - ab - af - ak - als - am - an - ang - ar - arc - as - ast - av - ay - az - ba - bar - bat_smg - bcl - be - be_x_old - bg - bh - bi - bm - bn - bo - bpy - br - bs - bug - bxr - ca - cbk_zam - cdo - ce - ceb - ch - cho - chr - chy - co - cr - crh - cs - csb - cu - cv - cy - da - de - diq - dsb - dv - dz - ee - el - eml - en - eo - es - et - eu - ext - fa - ff - fi - fiu_vro - fj - fo - fr - frp - fur - fy - ga - gan - gd - gl - glk - gn - got - gu - gv - ha - hak - haw - he - hi - hif - ho - hr - hsb - ht - hu - hy - hz - ia - id - ie - ig - ii - ik - ilo - io - is - it - iu - ja - jbo - jv - ka - kaa - kab - kg - ki - kj - kk - kl - km - kn - ko - kr - ks - ksh - ku - kv - kw - ky - la - lad - lb - lbe - lg - li - lij - lmo - ln - lo - lt - lv - map_bms - mdf - mg - mh - mi - mk - ml - mn - mo - mr - mt - mus - my - myv - mzn - na - nah - nap - nds - nds_nl - ne - new - ng - nl - nn - no - nov - nrm - nv - ny - oc - om - or - os - pa - pag - pam - pap - pdc - pi - pih - pl - pms - ps - pt - qu - quality - rm - rmy - rn - ro - roa_rup - roa_tara - ru - rw - sa - sah - sc - scn - sco - sd - se - sg - sh - si - simple - sk - sl - sm - sn - so - sr - srn - ss - st - stq - su - sv - sw - szl - ta - te - tet - tg - th - ti - tk - tl - tlh - tn - to - tpi - tr - ts - tt - tum - tw - ty - udm - ug - uk - ur - uz - ve - vec - vi - vls - vo - wa - war - wo - wuu - xal - xh - yi - yo - za - zea - zh - zh_classical - zh_min_nan - zh_yue - zu -