An Environmental Impact Assessment (EIA) is an assessment of the likely positive and/or negative influence a project may have on the environment. “Environmental Impact Assessment can be defined as: The process of identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant effects of development proposals prior to major decisions being taken and commitments made.”[1] The purpose of the assessment is to ensure that decision-makers consider environmental impacts before deciding whether to proceed with new projects.
Contents |
[edit] Overview
The US Environmental Protection Agency pioneered the use of pathway analysis to determine the likely human health impact of environmental factors. The technology for performing such analysis is properly labelled environmental science. The principal phenomena or pathways of impact are: soil contamination impacts, air pollution impacts, noise health effects, ecology impacts including endangered species assessment, geological hazards assessment and water pollution impacts. Pathway analysis and The Natural Step definitions subsequently became the basis of the global ISO 14000 series of environmental management standards and the more recent ISO 19011 auditing standard; however, these ISO standards are not in common use in the U.S. and most other countries.
After an EIA analysis, the Precautionary Principle and Polluter Pays may be applied to prevent, limit, or require strict liability or insurance coverage to a project, based on its likely harms.
Environmental impact analysis is sometimes controversial and contested. Related analysis of social impacts is achieved by Social impact assessment. Analysis of business impacts is achieved by context analysis. Design impacts are assessed in relation to context theory.
EIA predicts what a specific action can do to the environment.
[edit] EIA around the world
[edit] Australia
At the federal level, EIA provisions are contained within the EPBC Act (the Environment Protection and Biodiversity Conservation Act 1999). At the State [ie provincial] level, each jurisdiction has EIA provisions typically contained in land use planning law. For example in New South Wales (NSW), EIA is performed under either Part 3A, Part 4 or Part 5 of the Environmental Planning and Assessment Act 1979, depending on the type of development. Overlap between federal and state requirements is addressed via bilateral agreements or one off accreditation of state processes, as provided for in the EPBC Act.
[edit] China
The Environmental Impact Assessment Law (EIA Law) requires an environmental impact assessment to be completed prior to project construction. However, if a developer completely ignores this requirement and builds a project without submitting an environmental impact statement, the only penalty is that the environmental protection bureau (EPB) may require the developer to do a make-up environmental assessment. If the developer does not complete this make-up assessment within the designated time, only then is the EPB authorized to fine the developer. Even so, the possible fine is capped at a maximum of about US$25,000, a fraction of the overall cost of most major projects. The lack of more stringent enforcement mechanisms has resulted in a significant percentage of projects not completing legally required environmental impact assessments prior to construction.[2]
China's State Environmental Protection Administration (SEPA) used the legislation to halt 30 projects in 2004, including three hydro-power plants under the Three Gorges Project Company. Although one month later (Note as a point of reference, that the typical EIA for a major project in the USA takes one to two years.), most of the 30 halted projects resumed their construction, reportedly having passed the environmental assessment, the fact that these key projects' construction was ever suspended was notable.
A joint investigation by SEPA and the Ministry of Land and Resources in 2004 showed that 30 to 40 per cent of the mining construction projects went through the procedure of environment impact assessment as required, while in some areas only 6 to 7 per cent did so. This partly explains why China has witnessed so many mining accidents in recent years.
SEPA alone cannot guarantee the full enforcement of environmental laws and regulations, observed Professor Wang Canfa, director of the centre to help environmental victims at China University of Political Science and Law. In fact, according to Wang, the rate of China's environmental laws and regulations that are actually enforced is estimated to be barely 10 per cent.[3]
[edit] EU
The EIA Directive on Environmental Impact Assessment of the effects of projects on the environment was first introduced in 1985 and was amended in 1997. The directive was amended again in 2003 following the 1998 signature by the EU of the Aarhus Convention on public participation in environmental matters. The issue was enlarged to the assessment of plans and programmes by the so called SEA-Directive in 2001 which is now in force and establishes a mix of mandatory and discretionary procedures for assessing environmental impacts. [4]
Under the EU directive, an EIA must provide certain information to comply. There are seven key areas that are required:
1. Description of the project
- Description of actual project and site description
- Break the project down into its key components, ie construction, operations, decommissioning
- For each component list all of the sources of environmental disturbance
- For each component all the inputs and outputs must be listed, eg, air pollution, noise, hydrology
2. Alternatives that have been considered
- Examine alternatives that have been considered
- Example: in a biomass power station, will the fuel be sourced locally or nationally?
3. Description of the environment
- List of all aspects of the environment that may be effected by the development
- Example: populations, fauna, flora, air, soil, water, humans, landscape, cultural heritage
- This section is best carried out with the help of local experts, eg the RSPB in the UK
4. Description of the significant effects on the environment
- The word significant is crucial here as the definition can vary
- 'Significant' needs to be defined
- The most frequent method used here is use of the Leopold matrix
- The matrix is a tool used in the systematic examination of potential interactions
- Example: in a windfarm development a significant impact may be collisions with birds
5. Mitigation
- This is where EIA is most useful
- Once section 4 has been completed it will be obvious where the impacts will be greatest
- Using this information ways to avoid negative impacts should be developed
- Best working with the developer with this section as they know the project best
- Using the windfarm example again construction could be out of bird nesting seasons
6. Non-technical summary (EIS)
- The EIA will be in the public domain and be used in the decision making process
- It is important that the information is available to the public
- This section is a summary that does not include jargon or complicated diagrams
- It should be understood by the informed lay-person
7. Lack of know-how/technical difficulties
- This section is to advise any areas of weakness in knowledge
- It can be used to focus areas of future research
- Some developers see the EIA as a starting block for good environmental management
[edit] New Zealand
In New Zealand, EIA is usually referred to as Assessment of Environmental Effects (AEE). The first use of EIA's dates back to a Cabinet minute passed in 1974 called Environmental Protection and Enhancement Procedures. This had no legal force and only related to the activities of government departments. When the Resource Management Act was passed in 1991, an EIA was required as part of a resource consent application. Section 88 of the Act spells this out.
[edit] Sri Lanka
The importance of the Environmental Impact Assessment as an effective tool for the purpose of integrating environmental considerations with development planning is highly recognized in Sri Lanka. The application of this technique is considered as a means of ensuring that the likely effects of new development projects on the environment are fully understood and taken into account before development is allowed to proceed. The importance of this management tool to foresee potential environmental impacts and problems caused by proposed projects and its use as a mean to make project more suitable to the environment are highly appreciated. by Lakpethum
[edit] United States
Under United States environmental law an EIA is referred to as the Environmental Impact Statement (EIS), and originated in the National Environmental Policy Act (NEPA), enacted in the United States in 1969. Certain actions of federal agencies must be preceded by an EIS. Contrary to a widespread misconception, NEPA does not prohibit the federal government or its licensees/permittees from harming the environment, nor does it specify any penalty if the EIS turns out to be inaccurate, intentionally or otherwise. NEPA requires that plausible statements as to the prospective impacts be disclosed in advance. The purpose of NEPA process is to ensure that the decision maker is fully informed of the environmental aspects and consequences prior to making the final decision.
Usually, an agency will release a Draft Environmental Impact Statement (DEIS) for comment. Interested parties and the general public have the opportunity to comment on the draft, after which the agency will approve the Final Environmental Impact Statement (FEIS). Occasionally, the agency will later release a Supplemental Environmental Impact Statement (SEIS), especially if environmental conditions suddenly change after the issuance of the FEIS.
The adequacy of an EIS can be challenged in court. Major proposed projects have been blocked because of an agency's failure to prepare an acceptable EIS. One prominent example was the Westway landfill and highway development in and along the Hudson River in New York City [5]. Another prominent case involved the Sierra Club suing the Nevada Department of Transportation over its denial of Sierra Club's request to issue a supplemental EIS addressing air emissions of particulate matter and hazardous air pollutants in the case of widening US Highway 95 through Las Vegas.[6] The case reached the 9th Circuit Court of the United States, which led to construction on the highway being halted until the court's final decision. The case was settled prior to the court's final decision.
Several US state governments that have adopted "little NEPA's," i.e., state laws imposing EIS requirements for particular state actions and some of those state laws refer to the required environmental impact studies as Environmental Impact Reports or Environmental Impact Assessments. [7] For example, the California Environmental Quality Act (CEQA) requires an Environmental Impact Report (EIR).
These various state requirements are yielding voluminous data not just upon impacts of individual projects, but also to elucidate scientific areas that had not been sufficiently researched. For example, in a seemingly routine Environmental Impact Report for the city of Monterey, California, information came to light that led to the official federal endangered species listing of Hickman's potentilla, a rare coastal wildflower.
[edit] Transboundary EIA
Environmental threats do not respect national borders. European governments realized that to avert this danger, they must notify and consult each other on all major projects under consideration that might have adverse environmental impact across borders. The UNECE Convention on Environmental Impact Assessment in a Transboundary Context was negotiated to provide an international legal framework for transboundary EIA. [8]
[edit] See also
- Environmental good
- Environmental impact design
- Environmental impact statement
- Equator Principles
- Health Impact Assessment
- Healthy development measurement tool
- Leopold matrix
- Phase I Environmental Site Assessment
- Social Impact Assessment
- Strategic Environmental Assessment
[edit] References
- ^ Principle of Environmental Impact Assessment Best Practice (pdf). International Association for Impact Assessment (1999).
- ^ Wang, Alex (2007-02-05). Environmental protection in China: the role of law.
- ^ Gu, Lin (2005-09-29). China Improves Enforcement of Environmental Laws. China Features.
- ^ Watson, Michael (November 13-15, 2003). Environmental Impact Assessment and European Community Law. XIV International Conference "Danube-River of Cooperation".
- ^ Court decision in Sierra Club v. United States Army Corps of Engineers
- ^ Ritter, John. "Lawsuit pits risks and roads", USA Today, 2003-06-03.
- ^ Sive,D. & Chertok,M., "Little NEPAs" and Environmental Impact Assessment Procedures
- ^ Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991)
[edit] Further reading
- Petts, J. (ed), Handbook of Environmental Impact Assessment Vol 1 & 2, Blackwell, Oxford ISBN 0-632-04772-0
- Environmental Impact Assessment Review (1980 - ), Elsevier
- Glasson, J; Therivel, R; Chadwick A, Introduction to Environmental Impact Assessment, (2005) Routledge, London
[edit] External links
- European Commission - EIA website
- European Commission - IA TOOLS website on Impact Assessment Tools
- Environmental Impact Assessment at the University of Sydney
- Guide to Environmental Impact Assessment and Design
- International Association for Impact Assessment (IAIA)
- Dutch Commission for EIA
- UNU Open Educational Resource on EIA: A Course Module, Wiki and Instructional Guide
- US Household Environmental Impact Calculator