Vaughan Corporate Centre (TTC)
From Wikipedia, the free encyclopedia
This article or section contains information about a planned or expected future railway station. It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the railway station approaches, and more information becomes available. |
Vaughan Corporate Centre |
|
---|---|
Opened | Proposed for 2015 |
District | Vaughan (York Region) |
Line | Proposed Spadina line extension |
Next station | South to Highway 407 Transitway |
Platforms | |
Accessibility |
Vaughan Corporate Centre is a proposed station of the Yonge-University-Spadina line of the subway in Toronto, Ontario, Canada, to be built on its western branch, the Spadina line. If built, it would be located on Highway 7 at Millway Drive, west of Jane Street. It is expected to open in early 2015 when the Toronto Transit Commission (TTC) is estimated to be finished building the extension of the line to Steeles West.
The station is north of Steeles Avenue. This would be one of two stations that is outside the City of Toronto, specifically in the City of Vaughan, in York Region. It would also be the first terminus located outside the current City of Toronto.
[edit] Subway extension
The TTC has conducted the environmental assessment (see official link below) for the project to extend the Spadina line north from Downsview to York University, Steeles Avenue and the proposed Vaughan Corporate Centre. The governments of Ontario and Canada have each pledged $670 million of funding for its construction. The City of Toronto and the TTC have indicated their concerns about lacking funding to operate the subway once it is built.
[edit] External links
- The Spadina Subway Extension (official site)
- Map indicating alignment of extension and location of stations