Sin Ansan Line
From Wikipedia, the free encyclopedia
This article or section contains information about a planned or expected public transportation infrastructure. It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the infrastructure approaches, and more information becomes available. |
The Sin Ansan Line (meaning "New Ansan Line") is the tentative name of a commuter rail line that will eventually link Cheongnyangni Station with western Gyeonggi province, passing through key areas of the Seoul metropolitan area, including Yeouido, Yeongdeungpo and Gwangmyeong Station.
Since this line is still in the planning stages, there are many possible routes on which this line could be laid, with the only definite section between Sinpung and Gwangmyeong Station. In particular, the section south of Gwangmyeong Station has led to heated disputes between the cities of Ansan and Siheung.
Ansan has requested for the line to be built almost perfectly south from Gwangmyeong Station so it terminates at Hanyang University at Ansan, passing through Seongpo-dong on the way. This would also open the possibilities for the trains on this line to travel to Suwon via the Suin Line. The consortium behind the construction of the Sin Ansan Line, however, seems to favor a line running southwest from Gwangmyeong Station and joining the Sosa-Wonsi Line, transferring with Line 4 and the Suin Line at Gongdan Station and terminating at southwestern Ansan. The city of Siheung has recently made a shocking request, in which the section in dispute does not pass through the city of Ansan at all, making the name "Sin Ansan Line" meaningless. The Siheung plan has the section go west from Gwangmyeong Station, intersect the Sosa-Wonsi Line at Siheung City Hall, and terminating at Wolgot Station.
The original plans had the line follow this route: (SW) - Yeongdeungpo - Yeongdeungpo Market - National Assembly - Gwangheungchang - Sinchon - (NE). Recent plans, however, indicate another possible route with less stations: (SW) - Yeongdeungpo - Yeouido - Sinchon - (NE). The list of stations below reflects the original plans of this section, but is very likely to change.
Initial maps of Line 10 - the forerunner of this line - also showed that the line could, instead of going through Sinchon - Dongnimmun - Hyehwa, pass through Gongdeok - Seoul Station - Dongdaemun Stadium. However, following the restoration of the Cheonggye Stream, under which Line 10 was to be laid, the former route seems much more likely.
The first section of this line (Gwangmyeong Station - Yeouido) is set to be opened in 2011; the other sections will be opened subsequently.
[edit] Sin Ansan Line
NOTE: This is a tentative list of stations; most of the stations on the list are subject to sudden and drastic change. The section south of Gwangmyeong Station has not been included due to the severity of the dispute.
Station # | Station Name | Transferrable Lines | Station Type | Doors Open |
in Seoul | ||||
Cheongnyangni (planned) | Line 1 | Underground | ||
Anamogeori (planned) | Underground | |||
Changsin (planned) | Line 6 | Underground | ||
Hyehwa (planned) | Line 4 | Underground | ||
Gyeongbokgung (planned) | Line 3 | Underground | ||
Dongnimmun (planned) | Line 3 | Underground | ||
Severance Hospital (planned) | Underground | |||
Sinchon (planned) | Line 2 | Underground | ||
Gwangheungchang (planned) | Line 6 | Underground | ||
National Assembly (planned) | Line 9 | Underground | ||
Yeongdeungpo Market (planned) | Line 5 | Underground | ||
Yeongdeungpo (planned) | Line 1 | Underground | ||
Sinpung (planned) | Line 7 | Underground | ||
Guro Digital Complex (planned) | Line 2 | Underground | ||
Doksansageori (planned) | Underground | |||
Siheungsageori (planned) | Underground | |||
in Gyeonggi province | ||||
Seoksu (planned) | Line 1 | Underground | ||
Gwangmyeong (planned) | KTX Gyeongbu & Honam | Underground | ||
(planned extension south) |
NOTE: Stations between Gwangheungchang and Sinpung may be changed to the following alternate route:
Station # | Station Name | Transferrable Lines | Station Type | Doors Open |
in Seoul | ||||
Gwangheungchang (planned) | Line 6 | Underground | ||
Yeouido (planned) | Line 5, Line 9 | Underground | ||
Yeongdeungpo (planned) | Line 1 | Underground | ||
Dorim (planned) | Underground | |||
Sinpung (planned) | Line 7 | Underground |
|
|